Toronto address · Ward 18, Willowdale
89 Finch Ave W
The City of Toronto has 4 building permits since 2017 (4 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Addition or alteration · Multiple projects
REVISION 01: Proposed extension of 2nd and 3rd floor addition & all interior layoutsProposed elevator addition, building addition and divide 3rd floor into 2 residential suites
Applied Jun 18, 2025 · issued Sep 25, 2026 · 2 homes added · Permit 19 243936 BLD (revision 01)
- Inspections under way
Addition or alteration · Multiple projects
Proposed elevator addition, building addition and divide 3rd floor into 2 residential suites
Applied Nov 1, 2019 · issued Oct 28, 2020 · Permit 19 243936 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposed elevator addition, building addition and divide 3rd floor into 2 residential suites
Applied Nov 1, 2019 · issued Jan 11, 2021 · Permit 19 243936 HVA
- Inspections under way
Plumbing
Plumbing - Proposed elevator addition, building addition and divide 3rd floor into 2 residential suites
Applied Nov 1, 2019 · issued Jan 11, 2021 · Permit 19 243936 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To modify the existing three-storey building by constructing second and third floor additions at the rear of the building.
Decision: Approved (hearing Dec 4, 2025)
Filed Oct 23, 2025 · File A0451/25NY
- Closed
Minor variance · NR addition
To permit the construction of an elevator to the south side of the existing building in conjunction with converting the existing residential unit on the third storey, into two suites.
Decision: Approved (hearing Sep 26, 2019)
Filed Aug 5, 2019 · File A0554/19NY
What’s planned nearby
Development sites within 500 m
- Under review
3 storeys · 2 homes · Mixed use
250 m away · Site plan · Under review · filed May 4, 2021
- Under review
38-42 Finch Avenue West, 2-4 Greenview Avenue and 7 Eldora Avenue
46 storeys · 636 homes · Mixed use
330 m away · Rezoning · Under review · filed Nov 24, 2025
- Under review
- Under review
38 storeys · 399 homes · Mixed use
410 m away · Site plan · Under review · filed Jun 10, 2025
- Under review
- Approved
6 storeys · 71 homes · Residential
440 m away · Site plan · Approved · filed May 16, 2021
Neighbours’ Committee of Adjustment files within 250 m
68 Lorraine Dr · Minor variance
To construct a covered porch at the rear of the dwelling. Please note, the application was deferred on November 7, 2024 to allow the appicant to consult with the building departmnet.
150 m away · filed Oct 2, 2024 · Deferred
61 Lorraine Dr · Minor variance
Proposal to construct a new dwelling.
220 m away · filed Jan 12, 2024 · Approved
68 Lorraine Dr · Minor variance
Proposal to construct a new two storey detached single family dwelling
150 m away · filed May 18, 2022 · Approved
11 Altamont Rd · Minor variance
To permit an elevator structure within the interior courtyard measuring 5.2 metres above established grade whereas the SiteSpecific By-law 259-2020 (LPAT) and 260-2020(LPAT) do not permit a structure in this location.
200 m away · filed Jun 15, 2021 · Approved
10 Elmview Ave · Minor variance
To legalize and maintain the rear deck and front porch stairs.
230 m away · filed Oct 21, 2019 · Approved
54 Lorraine Dr · Minor variance
To construct a new dwelling.
240 m away · filed Mar 12, 2019 · Approved
69 Lorraine Dr · Minor variance
To construct a new 2-storey dwelling with integral garage.
180 m away · filed May 28, 2018 · Approved
4 Elmview Ave · Minor variance
To construct a new two-storey dwelling. The existing dwelling would be demolished.
230 m away · filed May 4, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.