Toronto address · Ward 18, Willowdale
54 Lorraine Dr
The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
New house · New building
Revision # 01 - To change the batt insulation of the attic space to 2 pound foam for providing R-60 value.Construct a two storey dwelling with attached garage and finished basement
Applied Dec 12, 2019 · issued Jan 6, 2020 · Permit 19 174566 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Construct a two storey dwelling with attached garage and finished basement
Applied Oct 17, 2019 · issued Oct 30, 2019 · Permit 19 174566 HVA
- Inspections under way
New house · New building
Construct a two storey dwelling with attached garage and finished basement
Applied Jun 19, 2019 · issued Jul 11, 2019 · 1 home added · Permit 19 174566 BLD
- Inspections under way
Drains and site services
Drain - Construct a two storey dwelling with attached garage and finished basement
Applied Jun 19, 2019 · issued Jul 11, 2019 · Permit 19 174566 DRN
- Inspections under way
Plumbing
Plumbing - Construct a two storey dwelling with attached garage and finished basement
Applied Jun 19, 2019 · issued Jul 11, 2019 · Permit 19 174566 PLB
- Closed
Demolition
Demolish existing two storey dwelling
Applied Jun 19, 2019 · issued Jul 11, 2019 · completed Sep 13, 2019 · 1 home removed · Permit 19 174591 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new dwelling.
Decision: Approved (hearing May 9, 2019)
Filed Mar 12, 2019 · File A0191/19NY
What’s planned nearby
Development sites within 500 m
- Under review
3 storeys · 2 homes · Mixed use
180 m away · Site plan · Under review · filed May 4, 2021
- Under review
38-42 Finch Avenue West, 2-4 Greenview Avenue and 7 Eldora Avenue
46 storeys · 636 homes · Mixed use
220 m away · Rezoning · Under review · filed Nov 24, 2025
- Under review
- Under review
38 storeys · 399 homes · Mixed use
370 m away · Site plan · Under review · filed Jun 10, 2025
- Under review
35 storeys · 608 homes · Mixed use
380 m away · Site plan · Under review · filed Aug 12, 2022
- Under review
26 storeys · 305 homes · Residential
380 m away · Site plan · Under review · filed Sep 26, 2024
Neighbours’ Committee of Adjustment files within 250 m
89 Finch Ave W · Minor variance
To modify the existing three-storey building by constructing second and third floor additions at the rear of the building.
240 m away · filed Oct 23, 2025 · Approved
68 Lorraine Dr · Minor variance
To construct a covered porch at the rear of the dwelling. Please note, the application was deferred on November 7, 2024 to allow the appicant to consult with the building departmnet.
130 m away · filed Oct 2, 2024 · Deferred
61 Lorraine Dr · Minor variance
Proposal to construct a new dwelling.
70 m away · filed Jan 12, 2024 · Approved
68 Lorraine Dr · Minor variance
Proposal to construct a new two storey detached single family dwelling
130 m away · filed May 18, 2022 · Approved
78 Santa Barbara Rd · Minor variance
To construct a second storey addition to the existing semi-detached dwelling.
220 m away · filed Aug 26, 2020 · Approved
80 Santa Barbara Rd · Minor variance
To construct a second storey addition to the existing semi-detached dwelling.
220 m away · filed Aug 26, 2020 · Approved
36 Santa Barbara Rd · Minor variance
To construct an enclosed front porch to the existing dwelling.
210 m away · filed Dec 3, 2019 · Approved
10 Elmview Ave · Minor variance
To legalize and maintain the rear deck and front porch stairs.
40 m away · filed Oct 21, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.