Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

42 Kirk Bradden Rd E

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a main floor and second storey addition, interior alterations, covered front porch and, a rear deck to an existing detached SFD.

    Applied Oct 6, 2022 · issued Oct 24, 2022 · completed Oct 21, 2024 · Permit 22 214064 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a main floor and second storey addition, interior alterations, covered front porch and, a rear deck to an existing detached SFD.

    Applied May 11, 2022 · issued Jul 6, 2022 · completed Oct 21, 2024 · Permit 22 145531 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct a main floor and second storey addition, interior alterations, covered front porch and, a rear deck to an existing detached SFD.

    Applied May 11, 2022 · issued Jul 6, 2022 · completed Oct 11, 2024 · Permit 22 145531 BLD

    Closed
  • Drains and site services

    Drain - Proposal to construct a main floor and second storey addition, interior alterations, covered front porch and, a rear deck to an existing detached SFD.

    Applied May 11, 2022 · issued Jul 6, 2022 · completed Oct 21, 2024 · Permit 22 145531 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey east side addition and a second storey addition above the existing dwelling.

    Decision: Approved (hearing Mar 10, 2022)

    Filed Dec 30, 2021 · File A0010/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 17 Kirk Bradden Rd E · Minor variance

    To construct a new detached dwelling with an attached garage.

    230 m away · filed Jan 20, 2026 · Approved

  • 49 Glenellen Dr E · Minor variance

    To construct a new detached dwelling with an attached garage.

    30 m away · filed Jun 19, 2025 · Approved

  • 32 Bernice Ave · Minor variance

    To construct rear two-storey addition and second storey addition above the existing dwelling along with a cabana in the rear yard.

    160 m away · filed Sep 12, 2024 · Approved

  • 19 South Kingslea Dr · Minor variance

    To construct a basement addition to connect an existing detached dwelling to an existing detached garage and a proposed deck above an existing garage.

    180 m away · filed Jul 14, 2023 · Approved

  • 21 Glenellen Dr E · Minor variance

    To construct two-storey rear and front additions. A previous Committee of Adjustment application (A0188/21EYK) approved variances for gross floor area, front yard and side yard setbacks.

    230 m away · filed Jan 10, 2022 · Approved

  • 24 Glenellen Dr E · Minor variance

    To construct a new detached dwelling with an attached garage and a shed in the rear yard.

    210 m away · filed Nov 25, 2021 · Approved

  • 11 South Kingslea Dr · Minor variance

    To construct a partial third storey addition, a covered front porch and two-storey front and rear additions.

    220 m away · filed Oct 20, 2021 · Approved

  • 5 Humber Ridge Dr · Minor variance

    To construct a second storey above the existing dwelling, a new front porch and new covered rear deck.

    200 m away · filed Jul 5, 2021 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.