Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

42 Queensbury Ave

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    REV #1-revise footing, posts, beam on ground floorsecond storey addition and rear one storey addition

    Applied Jun 12, 2013 · issued Aug 26, 2013 · Permit 12 157093 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - second storey addition and rear one storey addition

    Applied Nov 29, 2012 · issued Mar 4, 2013 · Permit 12 157093 HVA

    Inspections under way
  • Plumbing

    Plumbing - second storey addition and rear one storey addition

    Applied Apr 19, 2012 · issued Mar 4, 2013 · Permit 12 157093 PLB

    Inspections under way
  • Small residential project · Addition(s)

    second storey addition and rear one storey addition

    Applied Apr 19, 2012 · issued Mar 4, 2013 · Permit 12 157093 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 1336 Kingston Road

    8 storeys · 112 homes · Residential

    200 m away · Site plan · Under review · filed Aug 9, 2021

    Under review
  • 150 Clonmore Drive

    12 storeys · 287 homes · Residential

    350 m away · Site plan · Under review · filed Mar 23, 2022

    Under review
  • 2535 Gerrard Street East

    Not stated in the file

    360 m away · Rezoning · Approved · filed Apr 29, 2025

    Approved
  • 160-184 Clonmore Drive

    121 homes · Residential

    410 m away · Condominium · Approved · filed Jul 15, 2021

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Ferncroft Dr · Minor variance

    180 m away · filed Sep 24, 2026 · Accepted

  • 1402 Kingston Rd · Consent

    250 m away · filed Sep 8, 2026 · Postponed

  • 154 Audrey Ave · Minor variance

    To enclose a portion of the existing front porch (unheated space) and relocate stairs.

    120 m away · filed Jun 19, 2026 · Approved

  • 163 Audrey Ave · Minor variance

    To construct a new two-storey residential triplex dwelling with a basement walkout and convert the existing rear east yard shed into a two-storey garden suite. There will be a total of 4 dwelling units. The existing 1-storey dwelling will be demolished.

    130 m away · filed Nov 3, 2025 · Approved

  • 12 Woodland Park Rd · Minor variance

    To alter the existing one-storey detached dwelling by constructing a second-storey addition and a new rear deck.

    170 m away · filed Dec 19, 2024 · Approved

  • 25 Queensbury Ave · Minor variance

    To alter the existing two-storey detached dwelling with a secondary suite, by constructing interior renovations to reinsulate the dwelling, cladding the dwelling, a new rear deck, enlocsing the front porch and elimnating one of the two exsiting parking spaces. NOTE: This Revised Public Hearing Notice is being issued to add variance #8 and correct the purpose of application.

    70 m away · filed Oct 29, 2024 · Approved

  • 152 Audrey Ave · Minor variance

    To construct a one-storey addtion and deck in the rear yard.

    120 m away · filed Jul 5, 2024 · Approved

  • 12 Woodland Park Rd · Minor variance

    To construct a new 2nd floor above existing 1-storey house and a 2-storey side addition.

    170 m away · filed Sep 18, 2023 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.