Toronto address · Ward 3, Etobicoke-Lakeshore
42 Shaver Ave S
The City of Toronto has 8 building permits since 2017 (2 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to create a two unit in basement - total units - 3
Applied Jul 22, 2026 · issued Sep 11, 2026 · Permit 24 191933 HVA
- Inspections under way
Small residential project · Interior alterations
Interior alterations to create a two unit in basement - total units - 3
Applied Aug 1, 2024 · issued Oct 28, 2024 · 2 homes added · Permit 24 191933 BLD
- Closed
New house · New building
Revision 01. Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Dec 19, 2021 · issued Jul 18, 2023 · completed Sep 14, 2023 · Permit 20 119253 BLD (revision 01)
- Closed
Plumbing
Revision 01. Plumbing - Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Dec 19, 2021 · issued Aug 22, 2022 · completed Sep 11, 2023 · Permit 20 119253 PLB (revision 01)
- Closed
Demolition
Demo sfd
Applied Mar 3, 2020 · issued Aug 5, 2020 · completed Aug 8, 2023 · Permit 20 121294 DEM
- Closed
Plumbing
Plumbing - Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Feb 26, 2020 · issued Aug 5, 2020 · completed Sep 11, 2023 · Permit 20 119253 PLB
- Closed
Heating and ventilation
HVAC - Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Feb 26, 2020 · issued Apr 1, 2021 · completed Aug 8, 2023 · Permit 20 119253 HVA
- Closed
New house · New building
Proposal to demolish existing sfd and construct new two-storey detached dwelling.
Applied Feb 25, 2020 · issued Aug 5, 2020 · completed Sep 14, 2023 · 1 home added · Permit 20 119253 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0521/19EYK) approved a variance relating to gross floor area.
Decision: Approved (hearing Jan 26, 2023)
Filed Nov 14, 2022 · File A0589/22EYK
- Closed
Minor variance · New R building
To construct a detached dwelling with an integral garage.
Decision: Approved (hearing Nov 21, 2019)
Filed Oct 1, 2019 · File A0521/19EYK
What’s planned nearby
Development sites within 500 m
- Under review
6 storeys · 52 homes · Residential
380 m away · Site plan · Under review · filed Dec 29, 2025
Neighbours’ Committee of Adjustment files within 250 m
33 Statler Ave · Minor variance
To construct a new detached dwelling with an attached garage.
110 m away · filed Jun 2, 2026 · Approved
16 Downing St · Minor variance
To construct a detached garage in the rear yard.
180 m away · filed Mar 11, 2026 · Deferred
57 Silverhill Dr · Minor variance
To legalize and to maintain the rear second storey platform.
230 m away · filed May 21, 2024 · Approved
40 Ovida Ave · Minor variance
To construct a new detached dwelling with an attached garage.
170 m away · filed Feb 23, 2024 · Approved
56 Shaver Ave S · Minor variance
To legalize and to maintain the detached dwelling with an attached garage currently under construction. A previous Committee of Adjustment application (A0623/22EYK) approved variances relating to gross floor area and floor space index.
130 m away · filed Feb 5, 2024 · Approved
56 Shaver Ave S · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Dec 22, 2022 · Approved
28 Ovida Ave · Minor variance
To legalize and to maintain the as constructed accessory structure in the rear yard.
220 m away · filed Sep 7, 2022 · Approved
45 Paulart Dr · Minor variance
To construct a two-storey rear addition and a second storey addition above the existing dwelling.
200 m away · filed Sep 28, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.