Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 24, Scarborough-Guildwood

4280-4290 Kingston Rd

The City of Toronto has 13 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Interior alterations including (HVAC and Plumbing) to convert Hair salon to a dental office.

    Applied May 13, 2026 · issued May 14, 2026 · Permit 26 159869 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations including (HVAC and Plumbing) to convert Hair salon to a dental office.

    Applied May 13, 2026 · issued May 19, 2026 · Permit 26 159869 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations including (HVAC and Plumbing) to convert Hair salon to a dental office.

    Applied May 13, 2026 · issued May 19, 2026 · Permit 26 159869 PLB

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to office space

    Applied Nov 12, 2025 · issued Dec 2, 2025 · completed Mar 19, 2026 · Permit 25 252458 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to office space

    Applied Nov 12, 2025 · issued Dec 2, 2025 · completed Mar 23, 2026 · Permit 25 252458 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to office space

    Applied Nov 12, 2025 · issued Dec 2, 2025 · completed Mar 18, 2026 · Permit 25 252458 HVA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to remove and replace DCVA backflow preventer due to failed test after all parts have been replaced

    Applied Nov 24, 2022 · issued Dec 14, 2022 · completed Oct 19, 2023 · Permit 22 232792 PSA

    Closed
  • Plumbing

    Plumbing - Interior alterations to unit 8 for new Bakery - new partitions, washroom, plumbing and HVAC modifications

    Applied Aug 25, 2022 · issued Oct 20, 2022 · completed Jan 3, 2023 · Permit 22 195868 PLB

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to unit 8 for new Bakery - new partitions, washroom, plumbing and HVAC modifications

    Applied Aug 25, 2022 · issued Oct 20, 2022 · completed Jan 4, 2023 · Permit 22 195868 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to unit 8 for new Bakery - new partitions, washroom, plumbing and HVAC modifications

    Applied Aug 25, 2022 · issued Oct 20, 2022 · completed Jan 3, 2023 · Permit 22 195868 HVA

    Closed
  • Plumbing · Manholes/Catch Basins/Sumps/Interceptors

    install grease interceptor unit 6

    Applied Jan 30, 2018 · issued Mar 19, 2018 · completed Sep 30, 2021 · Permit 18 111438 PSA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposed Backflow Prevention Devices (Water only)

    Applied Apr 18, 2017 · issued May 8, 2017 · completed Sep 30, 2021 · Permit 17 145406 PSA

    Closed
Show 1 more permit
  • Designated structure · Sign building permit related

    To erect and display one illuminated third party ground sign which is 7.50 metres in height, containing two sign faces, each with static copy and each 6.10 metres wide by 3.05 metres long. A permit was issued for a non-accessory ground sign under the former City of Scarborough Zoning By-law and Sign By-law. Work never commenced and the permit was subsequently cancelled. The sign was erected and displayed after the permit was cancelled. The sign is proposed to be located in a C-Commercial sign district which only permits third party wall signs.**Pattison Outdoor**

    Applied Sep 11, 2012 · issued Nov 23, 2012 · completed Feb 6, 2018 · Permit 12 244003 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 8 Adams Dr · Minor variance

    To legalize 7 secondary suites in basement of single-detached dwelling. Previous Committee of Adjustment Decision A357/07SC.

    240 m away · filed Jul 17, 2023 · Refused

Everything planned in Scarborough-Guildwood

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.