The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Construction of cip concrete wall, steps and paving at existing basement walkout, Reconstruction of wood deck (larger with portion being covered with flat roof from ground floor.Englarement of exist door at rear of house (ground floor)

    Applied Mar 18, 2021 · issued Apr 6, 2021 · completed Oct 19, 2021 · Permit 21 128955 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 451 Wellesley St E · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear screened enclosure (replacing the ground floor deck), and rear second and third floor additions. The existing rear ground, second and third floor decks will be demolished.

    80 m away · filed Sep 9, 2025 · Approved

  • 32 Salisbury Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).

    230 m away · filed Jun 11, 2025 · Approved

  • 5 Parkview Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear third storey dormer addition. Also, to reconstruct the rear second storey balcony.

    150 m away · filed Jul 17, 2024 · Approved

  • 49 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half storey semi-detached dwelling by constructing a west side one-storey addition with new basement area below, and a west side three-storey elevator addition. Also the existing west side deck will be demolished. This site has heritage designation.

    190 m away · filed May 13, 2024 · Approved

  • 37 Hill Crest Pk · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition. Also, to reconstruct the wood deck (along the front, east side, and rear wall), and to construct a rear yard parking pad.

    160 m away · filed Sep 27, 2023 · Approved

  • 116 Amelia St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.

    130 m away · filed Jan 30, 2023 · Approved

  • 82 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey rear addition (dormer).

    120 m away · filed Dec 14, 2022 · Approved

  • 92 Amelia St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a rear third storey roof deck, a new rear ground floor addition (to replace the existing addition), and a rear second storey roof deck. This dwelling will have a total of two residential units.

    190 m away · filed Oct 25, 2022 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.