Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

43 Sunnylea Ave E

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - To demolish existing dwelling and construct a new two storey with integral garage

    Applied Sep 4, 2020 · issued Sep 15, 2020 · completed Dec 15, 2021 · Permit 20 135007 HVA

    Closed
  • Plumbing

    Plumbing - To demolish existing dwelling and construct a new two storey with integral garage

    Applied Apr 17, 2020 · issued May 22, 2020 · completed Jun 8, 2022 · Permit 20 135007 PLB

    Closed
  • New house · New building

    To demolish existing dwelling and construct a new two storey with integral garage

    Applied Apr 17, 2020 · issued May 22, 2020 · completed Nov 22, 2022 · 1 home added · Permit 20 135007 BLD

    Closed
  • Demolition

    To demolish existing dwelling and construct a new two storey dwelling with integrag garage

    Applied Apr 17, 2020 · issued May 22, 2020 · completed Dec 24, 2020 · 1 home removed · Permit 20 135013 DEM

    Closed
  • Drains and site services

    Drain - To demolish existing dwelling and construct a new two storey with integral garage

    Applied Apr 17, 2020 · issued May 22, 2020 · completed Dec 15, 2021 · Permit 20 135007 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a detached dwelling with an integral garage.

    Decision: Approved (hearing Feb 13, 2020)

    Filed Dec 17, 2019 · File A0670/19EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 28 Sunnylea Ave E · Minor variance

    To maintain the altered dwelling currently under construction, including the existing detached garage. A previous Committee of Adjustment application (A0212/22EYK) approved variances related to side yard setback, flat roof height, and setback encroachments.

    130 m away · filed Oct 16, 2025 · Approved

  • 67 Sunnylea Ave E · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Jul 28, 2025 · Approved

  • 19 South Kingslea Dr · Minor variance

    To construct a basement addition to connect an existing detached dwelling to an existing detached garage and a proposed deck above an existing garage.

    190 m away · filed Jul 14, 2023 · Approved

  • 28 Sunnylea Ave E · Minor variance

    To construct a two-storey rear addition and a second storey addition above the existing dwelling.

    130 m away · filed Mar 25, 2022 · Approved

  • 19 Glenaden Ave E · Minor variance

    To construct a two-storey rear addition and a new front porch.

    240 m away · filed Feb 1, 2022 · Approved

  • 48 Glenaden Ave E · Minor variance

    To construct two-storey rear and west side additions, a two-storey east side addition and a new covered rear deck.

    150 m away · filed Jan 17, 2022 · Approved

  • 16 Sunnylea Ave E · Minor variance

    To construct a two-storey rear addition, a new front porch and a rear yard deck.

    210 m away · filed Jan 13, 2022 · Approved

  • 11 South Kingslea Dr · Minor variance

    To construct a partial third storey addition, a covered front porch and two-storey front and rear additions.

    220 m away · filed Oct 20, 2021 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.