Toronto address · Ward 9, Davenport
44 Gordon St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation · Alter: add on /Ductwork
Proposed work includes the removal of existing ductwork and installation of new ducts throughout the basement, first floor, and second floor. In the attic room, the old ducts will be removed and replaced with a new ductless heating and cooling system. The scope of work will also require cutting, patching, and repainting of drywall in areas where new ducts are installed.
Applied Oct 9, 2025 · issued Oct 29, 2025 · completed Mar 13, 2026 · Permit 25 237974 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
18 storeys · 176 homes · Mixed use
220 m away · Site plan · Under review · filed Jun 30, 2025
- Under review
8 storeys · 57 homes · Mixed use
360 m away · Site plan · Under review · filed Feb 15, 2023
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
390 m away · Condominium · Under review · filed Oct 12, 2021
- Under review
12 storeys · 169 homes · Mixed use
480 m away · Condominium · Under review · filed Dec 16, 2021
Neighbours’ Committee of Adjustment files within 250 m
450 Dufferin St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 254-2025) for a 18-storey mixed-use building (62 m in building height) by increasing the number of storeys and building height to 20-storeys (62.5 m), increasing the mechanical penthouse height from 67 m to 67.3 m, increasing the height projections of equipment and structures, increasing the permitted total gross floor area and residential gross floor area, as well as reducing the amenity space and bicycle parking rate. There will be a total of 197 rental residential dwelling units (6 affordable rental units), 3…
230 m away · filed Nov 17, 2025 · Approved
11 Bank St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing one and two-storey rear additions.
110 m away · filed Oct 24, 2024 · Approved
524 Dufferin St · Minor variance
To alter the existing two- storey dwelling by demolishing the rear one-storey addition and constructing a new two-storey addition. Also, to construct a partial third storey addition with a rear balcony.
140 m away · filed Aug 30, 2023 · Approved
6 Delaney Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (east) three-storey addition and a third storey addition, a rear second storey balcony and a rear third storey balcony.
230 m away · filed Nov 30, 2022 · Approved
68 Florence St · Minor variance
To alter the existing two-unit, two-and-one-half-storey townhouse by constructing a rear second storey addition and a new basement secondary suite.
130 m away · filed Oct 7, 2022 · Approved
25 Gordon St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition, a complete third storey addition, a new front porch and basement walkout, a rear third storey balcony, second and third storey front bay windows, and a side (west) basement walkout.
70 m away · filed Sep 15, 2022 · Approved
6 Bank St · Minor variance
To alter the existing three-storey semi-detached dwelling by reconstructing the existing enclosed front porch.
160 m away · filed Apr 19, 2022 · Approved
11 Sheridan Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition and a three-storey rear addition with a rear third storey balcony.
70 m away · filed Jan 27, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.