Toronto address · Ward 8, Eglinton-Lawrence
44 Melrose Ave
The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REV - CHANGES WITH SOME OF THE DUCTS AND INTRODUCTION OF A 2ND FURNACE ON THE SECOND FLOORHVAC - Proposed demolotion of existing SFD and construction of new 2 storey SFD with integral garage, rear deck, rear basement walkout, rear 2nd storey balcony,
Applied Aug 13, 2024 · issued Sep 16, 2024 · Permit 23 136126 HVA (revision 02)
- Inspections under way
Drains and site services
Drain - Proposed demolotion of existing SFD and construction of new 2 storey SFD with integral garage, rear deck, rear basement walkout, rear 2nd storey balcony,
Applied Apr 20, 2023 · issued Jun 2, 2023 · Permit 23 136126 DRN
- Inspections under way
Heating and ventilation
HVAC - Proposed demolotion of existing SFD and construction of new 2 storey SFD with integral garage, rear deck, rear basement walkout, rear 2nd storey balcony,
Applied Apr 20, 2023 · issued Jun 2, 2023 · Permit 23 136126 HVA
- Inspections under way
Plumbing
Plumbing - Proposed demolotion of existing SFD and construction of new 2 storey SFD with integral garage, rear deck, rear basement walkout, rear 2nd storey balcony,
Applied Apr 20, 2023 · issued Jun 2, 2023 · Permit 23 136126 PLB
- Inspections under way
New house · New building
Proposed demolotion of existing SFD and construction of new 2 storey SFD with integral garage, rear deck, rear basement walkout, rear 2nd storey balcony,
Applied Apr 20, 2023 · issued Jun 2, 2023 · 1 home added · Permit 23 136126 BLD
- Closed
Demolition
Proposed demolotion of existing SFD and construction of new 2 storey SFD with integral garage, rear deck, rear basement walkout, rear 2nd storey balcony,
Applied Apr 20, 2023 · issued Jun 2, 2023 · completed Jul 21, 2026 · 1 home removed · Permit 23 136235 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new dweling.
Decision: Approved (hearing Nov 24, 2022)
Filed Sep 12, 2022 · File A0613/22NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
32 Yonge Blvd · Minor variance
To construct a new third storey deck.
220 m away · filed May 4, 2026 · Deferred
65 St Germain Ave · Minor variance
To construct a new detached dwelling with an integral garage, a covered rear deck and front porch.
180 m away · filed Jan 9, 2026 · Approved
290 Jedburgh Rd · Minor variance
To construct a new 3 storey dwelling with a rear deck and balcony.
200 m away · filed Jul 29, 2025 · Approved
35 Melrose Ave · Minor variance
To construct a two storey rear addition with basement and a rear deck. NOTE: This application was previously deferred at the Committee of Adjustment hearing on April 17, 2025.
70 m away · filed Mar 11, 2025 · Approved
32 Old Orchard Grv · Minor variance
To construct a new 3 storey detached dwelling
200 m away · filed Mar 5, 2025 · Approved
3344 Yonge St · Minor variance
To alter the existing building by constructing a three-storey rear addition and create one additional commercial unit and two additional residential units.
200 m away · filed Feb 13, 2025 · conditional approval
286 Jedburgh Rd · Minor variance
To demolish the existing 2-storey detached dwelling, and construct a new 3-storey detached dwelling with a rear deck.
200 m away · filed Oct 22, 2024 · Approved
76 St Germain Ave · Minor variance
Proposal to construct a new dwelling.
140 m away · filed Sep 15, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.