Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

447 Wellesley St E

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal for backwater valve installation

    Applied May 27, 2024 · issued May 27, 2024 · Permit 24 154546 DRN

    Inspections under way
  • Small residential project · Underpinning

    admin permit for underpinning of party wall shared between 445 and 447 wellesley ave e

    Applied Jun 15, 2006 · issued Jun 22, 2006 · completed Apr 30, 2021 · Permit 06 147281 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 451 Wellesley St E · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear screened enclosure (replacing the ground floor deck), and rear second and third floor additions. The existing rear ground, second and third floor decks will be demolished.

    20 m away · filed Sep 9, 2025 · Approved

  • 5 Parkview Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear third storey dormer addition. Also, to reconstruct the rear second storey balcony.

    80 m away · filed Jul 17, 2024 · Approved

  • 49 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half storey semi-detached dwelling by constructing a west side one-storey addition with new basement area below, and a west side three-storey elevator addition. Also the existing west side deck will be demolished. This site has heritage designation.

    250 m away · filed May 13, 2024 · Approved

  • 37 Hill Crest Pk · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition. Also, to reconstruct the wood deck (along the front, east side, and rear wall), and to construct a rear yard parking pad.

    170 m away · filed Sep 27, 2023 · Approved

  • 116 Amelia St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.

    160 m away · filed Jan 30, 2023 · Approved

  • 82 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey rear addition (dormer).

    180 m away · filed Dec 14, 2022 · Approved

  • 92 Amelia St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a rear third storey roof deck, a new rear ground floor addition (to replace the existing addition), and a rear second storey roof deck. This dwelling will have a total of two residential units.

    220 m away · filed Oct 25, 2022 · Approved

  • 467 Sackville St · Minor variance

    To alter the existing two-storey townhouse by constructing a rear third storey dormer.

    240 m away · filed Feb 23, 2021 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.