Toronto address · Ward 13, Toronto Centre
449 Wellesley St E
The City of Toronto has 5 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Party wall admin permits
Proposal for small structural work to existing party wall shared between 449 & 451 Wellesley St E - See 26 144023 SR
Applied Apr 15, 2026 · issued Jun 5, 2026 · Permit 26 144158 BLD
- Inspections under way
Small residential project · Multiple projects
Proposed 3rd floor addition, 3rd floor deck, and interior alterations to the ground floor.
Applied May 8, 2017 · issued Sep 29, 2017 · Permit 17 156224 BLD
- Closed
Plumbing
Plumbing - Proposed 3rd floor addition, 3rd floor deck, and interior alterations to the ground floor.
Applied May 8, 2017 · issued Sep 29, 2017 · completed Sep 8, 2025 · Permit 17 156224 PLB
- Closed
Plumbing
Plumbing - Proposed interior alterations to the main floor kitchen
Applied Jun 28, 2016 · issued Jul 8, 2016 · completed Mar 2, 2017 · Permit 16 182236 PLB
- Closed
Small residential project · Interior alterations
Proposed interior alterations to the main floor kitchen
Applied Jun 28, 2016 · issued Jul 8, 2016 · completed Mar 2, 2017 · Permit 16 182236 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 2½ -storey semi-detached dwelling by constructing a rear third-storey addition and a rear third floor deck.
Decision: Approved (hearing Mar 1, 2017)
Filed Nov 21, 2016 · File A1135/16TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
451 Wellesley St E · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear screened enclosure (replacing the ground floor deck), and rear second and third floor additions. The existing rear ground, second and third floor decks will be demolished.
10 m away · filed Sep 9, 2025 · Approved
5 Parkview Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear third storey dormer addition. Also, to reconstruct the rear second storey balcony.
70 m away · filed Jul 17, 2024 · Approved
37 Hill Crest Pk · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition. Also, to reconstruct the wood deck (along the front, east side, and rear wall), and to construct a rear yard parking pad.
170 m away · filed Sep 27, 2023 · Approved
116 Amelia St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.
170 m away · filed Jan 30, 2023 · Approved
82 Salisbury Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey rear addition (dormer).
190 m away · filed Dec 14, 2022 · Approved
92 Amelia St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a rear third storey roof deck, a new rear ground floor addition (to replace the existing addition), and a rear second storey roof deck. This dwelling will have a total of two residential units.
240 m away · filed Oct 25, 2022 · Approved
433 Wellesley St E · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition and a rear ground floor deck.
50 m away · filed Oct 2, 2020 · Approved
89 Amelia St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear third storey dormer.
240 m away · filed Mar 4, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.