Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

45 Park Blvd

The City of Toronto has 5 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Accessory Building(s)

    This project is to construct an outdoor play structure in the form of a treehouse that's elevated above the ground by 3m. It is supported by steel posts and penetrates the ground, avoiding tree roots by sonotubes, installed under supervision of an arborist. The envelope is seasonal and the play structure is not meant to be habitable. (22 106110 WET 03 MV)

    Applied Oct 13, 2022 · issued Nov 16, 2023 · Permit 22 216688 BLD

    Inspections under way
  • Heating and ventilation

    Revision to duct layoutHVAC - Second storey addition over the existing dwelling and rear two storey addition, balcony, parking pad at rear

    Applied Dec 8, 2015 · issued Dec 23, 2015 · completed Jan 6, 2017 · Permit 15 131784 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Second storey addition over the existing dwelling and rear two storey addition, balcony, parking pad at rear

    Applied Aug 7, 2015 · issued Sep 10, 2015 · completed Jan 6, 2017 · Permit 15 131784 HVA

    Closed
  • Plumbing

    Plumbing - Second storey addition over the existing dwelling and rear two storey addition, balcony, parking pad at rear

    Applied Mar 24, 2015 · issued Jun 12, 2015 · completed Jan 6, 2017 · Permit 15 131784 PLB

    Closed
  • Small residential project · Multiple projects

    Second storey addition over the existing dwelling and rear two storey addition, balcony, parking pad at rear

    Applied Mar 24, 2015 · issued Jun 12, 2015 · completed Dec 10, 2020 · Permit 15 131784 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To maintain the ancillary structure (treehouse) the rear yard.

    Decision: Approved (hearing Aug 18, 2022)

    Filed Jan 20, 2022 · File A0164/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 4 Chapel Rd · Minor variance

    To legalize and to maintain the ancillary building (shed) in the rear yard.

    50 m away · filed Aug 10, 2026 · Deferred

  • 276 Lake Promenade · Minor variance

    Proposal for a second and third floor front addition and a new roof over the front porch.

    140 m away · filed Oct 22, 2025 · Postponed

  • 9 Thirty Sixth St · Minor variance

    To construct a new detached dwelling with an attached garage. The new detached dewlling will have two units.

    180 m away · filed Aug 20, 2025 · Approved

  • 26 Park Blvd · Minor variance

    To construct a new garden suite in the rear yard.

    160 m away · filed Jan 8, 2025 · Postponed

  • 11 Thirty Sixth St · Minor variance

    To construct a new detached dwelling with an attached garage and a deck in the rear yard.

    170 m away · filed Dec 31, 2024 · Refused

  • 14 Long Branch Ave · Minor variance

    To construct a new rear yard detached garage with a garden suite.

    100 m away · filed Feb 8, 2024 · Approved

  • 32 Muskoka Ave · Minor variance

    To construct a new semi-detached duplex with an attached garage.

    150 m away · filed Jan 19, 2023 · Approved

  • 32 Muskoka Ave · Minor variance

    To construct a new semi-detached duplex with an attached garage.

    150 m away · filed Jan 19, 2023 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.