Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

45 Van Dusen Blvd

The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    REV 01 - New DesignHVAC - Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling

    Applied Dec 24, 2021 · issued Jan 4, 2022 · completed Jan 20, 2023 · Permit 20 212021 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling

    Applied Oct 28, 2020 · issued Feb 24, 2021 · completed Jan 20, 2023 · Permit 20 212021 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling

    Applied Oct 28, 2020 · issued Feb 24, 2021 · completed Jan 30, 2023 · Permit 20 212021 PLB

    Closed
  • New house · New building

    Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling

    Applied Oct 28, 2020 · issued Feb 24, 2021 · completed Aug 28, 2023 · 1 home added · Permit 20 212021 BLD

    Closed
  • Demolition

    Proposal to demolish existing 1 storey single family dwelling to construct a new 2 storey single family dwelling

    Applied Oct 28, 2020 · issued Feb 24, 2021 · completed Jan 20, 2023 · 1 home removed · Permit 20 212071 DEM

    Closed
  • Drains and site services

    Drain - Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling

    Applied Oct 28, 2020 · issued Feb 24, 2021 · completed Jan 20, 2023 · Permit 20 212021 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new detached dwelling with an attached garage.

    Decision: Approved (hearing Mar 9, 2017)

    Filed Jan 17, 2017 · File A0046/17EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 74 Brentwood Rd S · Minor variance

    To construct a new rear deck with a second storey addition above.

    130 m away · filed Apr 20, 2026 · Approved

  • 32 Orchard Cres · Minor variance

    To convert the existing attached garage into habitable space.

    150 m away · filed Apr 17, 2026 · Approved

  • 95 Thompson Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a new one-storey front addition.

    70 m away · filed Sep 16, 2025 · Approved

  • 48 Thompson Ave · Minor variance

    To construct a two-storey rear and south side addition, and a deck in the rear yard.

    230 m away · filed Jul 24, 2025 · Approved

  • 50 Orchard Cres · Minor variance

    To construct a new detached dwelling with an attached garage, a rear covered deck, and an in ground pool and cabana in the rear yard.

    130 m away · filed Jan 17, 2025 · Approved

  • 73 Thompson Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    150 m away · filed Dec 3, 2024 · Approved

  • 74 Meadowvale Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    200 m away · filed Oct 21, 2024 · Approved

  • 75 Meadowvale Dr · Minor variance

    To maintain the existing dwelling.

    160 m away · filed Sep 4, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.