Toronto address · Ward 3, Etobicoke-Lakeshore
450 Kipling Ave
The City of Toronto has 43 building permits since 2017 (33 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started
Designated structure · Sign building permit related
3 wall signs + 1 roof sign as per 26 197348 ZMP 00 ZR**YA YA FOODS CORP**
Applied Sep 18, 2026 · Permit 26 240076 DST
- Not started
Alternative solution
Proposal for alternative solutions for code analysis reports on behalf of Checkpoint Group in support of the proposed building addition and fit-out at 450 Kipling Ave which will contain a new automated Storage and Retrieval Syatem (ASRS) for the storage of general commodities.
Applied Aug 14, 2026 · Permit 26 219731 ALT
- Not started
Alternative solution
Proposal for alternative solutions for code analysis reports in support of the proposed building addition and fit-out which will contain a new Automated Storage and Retrieval (ASRS) systems for the storage of general commodities.
Applied Aug 4, 2026 · Permit 26 213443 ALT
- Under review
Addition or alteration · Interior alterations
Proposal to construct an automated storage and retrrieval (ASRS) system within an existing warehouse
Applied Jul 31, 2026 · Permit 26 212597 BLD
- Cancelled
Designated structure · Sign building permit related
1 wall sign**YA YA FOODS CORP**
Applied Apr 10, 2026 · completed Apr 14, 2026 · Permit 26 141602 DST
- Revision issued
Plumbing
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site conditions.Plumbing - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Feb 18, 2026 · issued Apr 14, 2026 · Permit 23 198739 PLB (revision 01)
- Revision issued
Drains and site services · Inside and outside drains
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site conditions.Drain - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Feb 18, 2026 · issued Apr 15, 2026 · Permit 23 198739 STS (revision 01)
- Revision issued
Drains and site services
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site conditions.Drain - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Feb 18, 2026 · issued Apr 14, 2026 · Permit 23 198739 DRN (revision 01)
- Inspections under way
Drains and site services · Inside and outside drains
Drain - Upgrade the storm collection network through installing new catch basins and treatment tank in the waste area and connect to existing storm. Re-surface the paved areas with proper slopes towards the proposed catchbasins
Applied Oct 22, 2025 · issued Nov 20, 2025 · Permit 25 243357 STS
- Inspections under way
Addition or alteration · Other
Upgrade the storm collection network through installing new catch basins and treatment tank in the waste area and connect to existing storm. Re-surface the paved areas with proper slopes towards the proposed catchbasins
Applied Oct 22, 2025 · issued Nov 20, 2025 · Permit 25 243357 BLD
- Cancelled
Addition or alteration · Interior alterations
Proposal to to construct an automated storage and retrieval (ASRS) system within an existing warehouse.
Applied Aug 25, 2025 · completed Sep 29, 2025 · Permit 25 215726 BLD
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
Proposal to replace existing 8" Zurn 475 RP premise isolation backflow preventer because it is beyond repair with a 3" Watts 009.
Applied Jun 23, 2025 · issued Jun 30, 2025 · Permit 25 181782 PSA
Show 31 more permits
- Closed
Heating and ventilation
REV 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site conditions.HVAC - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Jun 12, 2025 · issued Jul 18, 2025 · completed Apr 30, 2026 · Permit 23 198739 HVA (revision 01)
- Revision issued
Addition or alteration · Addition(s)
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site conditions.New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Jun 12, 2025 · issued Sep 23, 2025 · Permit 23 198739 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct a guard house and fire pump house with public washrooms (2 buildings)
Applied Jul 4, 2024 · issued Jan 29, 2025 · completed Apr 30, 2026 · Permit 24 174578 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a guard house and fire pump house with public washrooms (2 buildings)
Applied Jul 4, 2024 · issued Jan 29, 2025 · completed Apr 27, 2026 · Permit 24 174578 PLB
- Closed
New building
Proposal to construct a guard house and fire pump house with public washrooms (2 buildings)
Applied Jul 4, 2024 · issued Jan 29, 2025 · completed Apr 24, 2026 · Permit 24 174578 BLD
- Closed
Fire and security upgrade · Fire alarm
Proposed installation of fire alarm in this industrial building
Applied Oct 13, 2023 · issued Jan 19, 2024 · completed Sep 10, 2026 · Permit 23 214136 FSU
- Inspections under way
Addition or alteration · Addition(s)
New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Sep 6, 2023 · issued Feb 3, 2025 · Permit 23 198739 BLD
- Inspections under way
Plumbing
Plumbing - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Sep 6, 2023 · issued Jan 28, 2025 · Permit 23 198739 PLB
- Inspections under way
Drains and site services · Inside and outside drains
Drain - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Sep 6, 2023 · issued Jan 30, 2025 · Permit 23 198739 STS
- Closed
Heating and ventilation
HVAC - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Sep 6, 2023 · issued Jan 28, 2025 · completed Apr 30, 2026 · Permit 23 198739 HVA
- Inspections under way
Drains and site services
Drain - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Applied Sep 6, 2023 · issued Jan 28, 2025 · Permit 23 198739 DRN
- Inspections under way
Drains and site services · Site service
Proposal for adding a new sanitary pipe to the existing municipal sanitary pipe.
Applied Oct 2, 2020 · issued Oct 13, 2020 · Permit 20 202171 STS
- Revision issued
Plumbing · Piping: other buildings
REV 01 - Changes as per bubbled drawing. Proposal for the addition of new Sanitary pipe in the existing "YAYA Food Corp." Building.
Applied Aug 22, 2020 · issued Oct 13, 2020 · Permit 20 108110 PSA (revision 01)
- Permit issued
Addition or alteration · Addition(s)
Proposed addition for chemical tanks warehouse
Applied Feb 27, 2020 · issued Sep 28, 2021 · Permit 20 119731 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposed addition for chemical tanks warehouse
Applied Feb 27, 2020 · issued Sep 28, 2021 · Permit 20 119731 HVA
- Inspections under way
Plumbing · Piping: other buildings
Proposal for the addition of new Sanitary pipe in the existing "YAYA Food Corp." Building.
Applied Jan 23, 2020 · issued Apr 28, 2020 · Permit 20 108110 PSA
- Closed
Designated structure · Sign building permit related
To erect four non-illuminated wall signs displaying static copy. All measuring 3.96 meters horizontally by 0.91 meters vertically at the height of 6.71 meters on the south and 5.84 meters on both east and west elevation. ****UNITED RENTALS****
Applied Jan 15, 2020 · issued Jan 29, 2020 · completed May 15, 2020 · Permit 20 104150 DST
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations for existing office building
Applied Dec 2, 2019 · issued Jan 7, 2020 · Permit 19 256148 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations for existing office building
Applied Dec 2, 2019 · issued Jan 7, 2020 · completed Sep 15, 2021 · Permit 19 256148 PLB
- Revision issued
Addition or alteration · Addition(s)
REVISION - to increase area of addition in processing room. Revision for foundations, caissons proposed for entire addition. (VN)Construct addition at side of an existing industrial building for the same use "YAYA Foods" Juices and Dairy.
Applied Aug 19, 2019 · issued May 16, 2022 · Permit 17 146753 BLD (revision 01)
- Examiner's notice sent
Plumbing
Plumbing - Construct addition at side of an existing industrial building for the same use.
Applied Apr 20, 2017 · Permit 17 146753 PLB
- Permit issued
Addition or alteration · Addition(s)
Construct addition at side of an existing industrial building for the same use "YAYA Foods" Juices and Dairy.
Applied Apr 20, 2017 · issued Jul 20, 2017 · Permit 17 146753 BLD
- Examiner's notice sent
Heating and ventilation
HVAC - Construct addition at side of an existing industrial building for the same use.
Applied Apr 20, 2017 · Permit 17 146753 HVA
- Permit issued
Plumbing
Plumbing - Permit to construct new loading bay addition to existing food storage wharehouse building with related HVAC & Plumbing work.
Applied Mar 19, 2015 · issued Sep 23, 2015 · Permit 15 129667 PLB
- Inspections under way
Heating and ventilation
HVAC - Permit to construct new loading bay addition to existing food storage wharehouse building with related HVAC & Plumbing work.
Applied Mar 19, 2015 · issued Sep 23, 2015 · Permit 15 129667 HVA
- Permit issued
Addition or alteration · Addition(s)
Permit to construct new loading bay addition to existing food storage wharehouse building with related HVAC & Plumbing work.
Applied Mar 19, 2015 · issued Sep 23, 2015 · Permit 15 129667 BLD
- Permit issued
Fire and security upgrade · Sprinklers
Remove and replace all existing spriknlers heads (piping to be re-used) with new heads in "bay 5" only of existing warehouse.
Applied May 28, 2014 · issued Jul 3, 2014 · Permit 14 163114 FSU
- Revision issued
Plumbing · Piping: other buildings
Revision 02 re; To add additional manhole, install Water Meter in Chamber, change proposed location of sanitary and water piping. Revision 01 to change location of proposed connection. (Proposed new water and sanitary connection for industrial processing plant
Applied Dec 5, 2011 · issued Dec 23, 2011 · Permit 10 260055 PSA (revision 02)
- Revision issued
Plumbing · Piping: other buildings
Revision 01 to change location of proposed connection. (Proposed new water and sanitary connection for industrial processing plant
Applied Apr 28, 2011 · issued May 31, 2011 · Permit 10 260055 PSA (revision 01)
- Permit issued
Addition or alteration · Underpinning
To underpin an interior column and a portion of interior wall footings to facilitate the replacement of an area of subsoil and slab on grade as identified on plan (Fig. 1).
Applied Dec 8, 2010 · issued Feb 9, 2011 · Permit 10 310824 BLD
- Inspections under way
Plumbing · Piping: other buildings
Proposed new water and sanitary connection for industrial processing plant.
Applied Sep 17, 2010 · issued Oct 28, 2010 · Permit 10 260055 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.