Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

450 Pape Ave

The City of Toronto has 12 building permits since 2017 and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to construct interior alterations to 3rd floor corridor, new vestibule and a raised dormer to provide headroom clearance at third floor exit

    Applied May 4, 2023 · issued May 12, 2023 · completed Oct 23, 2023 · Permit 23 124183 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations to 3rd floor corridor, new vestibule and a raised dormer to provide headroom clearance at third floor exit

    Applied May 4, 2023 · issued May 12, 2023 · completed Sep 29, 2023 · Permit 23 124183 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal to construct interior alterations to 3rd floor corridor, new vestibule and a raised dormer to provide headroom clearance at third floor exit

    Applied Mar 17, 2023 · issued May 3, 2023 · completed Oct 23, 2023 · Permit 23 124183 BLD

    Closed
  • Addition or alteration · Interior alterations

    REVISION 02 - Revised concrete pad and backup generator with level 3 sound enclosure in northwest corner of the site, along with associated fencing (please see the attached cover letter)REVISION - as per the attached letterProposal for renovations to an existing crisis care facility. Scope of work includes interior alterations, exterior re-cladding, new elevator and landscaping -

    Applied Apr 1, 2021 · issued May 3, 2021 · completed Sep 26, 2024 · Permit 19 132273 BLD (revision 02)

    Closed
  • Plumbing

    REVISION 02 - M-7 Ground Floor Plan - Plumbing ; M-25 Site Plan - Gas Service ; E-2 Site Plan - Electrical ; E-7 Basement Floor Plan - Power ; E-8 Ground Floor Plan - Power ; E-10 Third Floor Plan - Power ; E-12 Power Distribution Diagram & Fire Alarm Riser Diagram REVISION - as per the attached letterPlumbing - INTERIOR RENOVATION OF AN EXISTING RESIDENTIAL 3-STOREY PLUS BASEMENT DESIGNATED HERITAGE STRUCTURE, INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 3-STOREY 1960'S ANNEX ADDITION, SITE GRADING & SERVICES

    Applied Apr 1, 2021 · issued Apr 21, 2021 · completed Nov 23, 2023 · Permit 19 132273 PLB (revision 02)

    Closed
  • Heating and ventilation

    REVISION - as per the attached letterHVAC - INTERIOR RENOVATION OF AN EXISTING RESIDENTIAL 3-STOREY PLUS BASEMENT DESIGNATED HERITAGE STRUCTURE, INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 3-STOREY 1960'S ANNEX ADDITION, SITE GRADING & SERVICES

    Applied Oct 19, 2020 · issued Nov 17, 2020 · completed Jan 11, 2022 · Permit 19 132273 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REVISION - as per the attached letterProposal for renovations to an existing crisis care facility. Scope of work includes interior alterations, exterior re-cladding, new elevator and landscaping -

    Applied Oct 19, 2020 · issued Nov 26, 2020 · completed Sep 26, 2024 · Permit 19 132273 BLD (revision 01)

    Closed
  • Plumbing

    REVISION - as per the attached letterPlumbing - INTERIOR RENOVATION OF AN EXISTING RESIDENTIAL 3-STOREY PLUS BASEMENT DESIGNATED HERITAGE STRUCTURE, INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 3-STOREY 1960'S ANNEX ADDITION, SITE GRADING & SERVICES

    Applied Oct 19, 2020 · issued Nov 17, 2020 · completed Nov 23, 2023 · Permit 19 132273 PLB (revision 01)

    Closed
  • Heating and ventilation

    Hvac - interior renovation of an existing residential 3-storey plus basement designated heritage structure, interior & exterior renovation of an existing 3-storey 1960's annex addition, site grading & services

    Applied Mar 28, 2019 · issued Sep 24, 2019 · completed Jan 11, 2022 · Permit 19 132273 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for renovations to an existing crisis care facility. Scope of work includes interior alterations, exterior re-cladding, new elevator and landscaping -

    Applied Mar 28, 2019 · issued Sep 24, 2019 · completed Sep 26, 2024 · Permit 19 132273 BLD

    Closed
  • Drains and site services · Inside and outside drains

    Drain - INTERIOR RENOVATION OF AN EXISTING RESIDENTIAL 3-STOREY PLUS BASEMENT DESIGNATED HERITAGE STRUCTURE, INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 3-STOREY 1960'S ANNEX ADDITION, SITE GRADING & SERVICES

    Applied Mar 28, 2019 · issued Nov 26, 2019 · completed Nov 23, 2023 · Permit 19 132273 STS

    Closed
  • Plumbing

    Plumbing - INTERIOR RENOVATION OF AN EXISTING RESIDENTIAL 3-STOREY PLUS BASEMENT DESIGNATED HERITAGE STRUCTURE, INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 3-STOREY 1960'S ANNEX ADDITION, SITE GRADING & SERVICES

    Applied Mar 28, 2019 · issued Sep 24, 2019 · completed Nov 23, 2023 · Permit 19 132273 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To alter the existing two-and-one-half-storey detached building by constructing a third storey addition (elevator vestibule), a new porch with stairs and a pedestrian ramp, and to reconstruct a dormer (to be raised).

    Decision: Approved (hearing Sep 14, 2022)

    Filed May 30, 2022 · File A0644/22TEY

    Closed
  • Minor variance · Other

    To convert the existing three-storey building with a two storey annex building to an apartment building contain 28 residential units (ten studio, twelve 1-bedroom and five 2-bedroom units). Third and fourth floor additions will be constructed to the annex building.

    Decision: Refused (hearing Sep 28, 2016)

    Filed Oct 27, 2015 · Appeal: OMB approved · File A1078/15TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 260 Bain Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a third storey side (west) roof deck. The rear ground floor one-storey addition has been demolished and a new rear ground floor deck with stairs and as well as a rear basement walkout has already been constructed under approved Building Permit No. 24 172386 BLD 02 SR.

    190 m away · filed May 23, 2025 · Approved

  • 255 Bain Ave · Minor variance

    To construct a new three-storey detached dwelling with a front porch, a third storey terrace (above the second floor at the southwest portion of the dwelling), and a rear ground floor deck. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    160 m away · filed Dec 27, 2024 · Approved

  • 301 Riverdale Ave · Minor variance

    To legalize and to maintain the rear second floor addition, of the existing two-storey semi-detached dwelling, which was constructed beyond the limits of the authorized building permit.

    110 m away · filed Nov 5, 2024 · Approved

  • 10 Poucher St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.

    200 m away · filed Jul 26, 2024 · Approved

  • 195 Withrow Ave · Minor variance

    To construct a new three-storey detached dwelling with a rear ground level deck, a rear basement walkout with stairs, and a rear third floor balcony. Also, to construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway. The existing three-storey apartment building (containing three dwelling units), and rear detached garage will be demolished.

    240 m away · filed Jan 8, 2024 · Approved

  • 287 Withrow Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial front second storey addition, partial front and rear third storey additions (with front second and third storey juliette balconies), and a rear third storey balcony.

    150 m away · filed Aug 16, 2023 · Approved

  • 203 Withrow Ave · Minor variance

    To construct a new two-storey ancillary building (laneway suite), in the rear yard, abutting the laneway.

    220 m away · filed Aug 11, 2023 · Approved

  • 515 Pape Ave · Minor variance

    To alter the existing one-storey ancillary building by constructing a complete second storey with a roof terrace. This building will be converted into a garden suite.

    250 m away · filed Jan 17, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.