Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

48 Glen Stewart Cres

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal for Backwater Valve.

    Applied Apr 4, 2021 · issued Apr 7, 2021 · completed Apr 13, 2021 · Permit 21 135858 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 558-564 Kingston Road

    8 storeys · 57 homes · Residential

    240 m away · Rezoning · Under review · filed Apr 23, 2021

    Under review
  • 346 Lee Avenue

    3 homes · Not stated in the file

    290 m away · Condominium · Under review · filed May 16, 2023

    Under review
  • 507-511 Kingston Road

    Not stated in the file

    340 m away · Site plan · Approved · filed Mar 15, 2022

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 342 Lee Ave · Minor variance

    To permit and maintain the existing rear ground floor deck (pie-shaped) of the two-and-one-half-storey semi-detached dwelling, abutting the rear (west) and sides (north and south) of the lot.

    250 m away · filed Jan 7, 2026 · Approved

  • 5 Leonard Crcl · Minor variance

    To alter the existing two-storey detached dwelling by constructing a side (north) second storey addition (over the existing garage) and a rear one-storey addition (at the southeast portion of the dwelling).

    220 m away · filed Nov 20, 2024 · Approved

  • 17 Cavendish St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one and two-storey addition (to contain a sunroom and an attached garage). There will be an exterior staircase along the south wall of the attached garage to access a deck above this garage. The existing rear one-storey addition and deck will be demolished. Also, to permit the removal of the one-storey ancillary building (detached garage) in the rear yard, that was demolished without an authorized building permit.

    170 m away · filed Jul 7, 2024 · Approved

  • 20 Cavendish St · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear three-storey addition, a complete fourth storey addition with front and rear balconies, a rear second storey deck, and a rear third storey juliette balcony.

    160 m away · filed Apr 11, 2024 · Approved

  • 38 Glen Ames · Minor variance

    To alter the existing two-storey detached dwelling by constructing a second storey addition (to replace the existing second floor side dormers), a rear second storey balcony, and a front yard retaining wall and steps.

    240 m away · filed Mar 25, 2024 · Approved

  • 39 Glen Stewart Cres · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a rear basement walkout, a covered front porch, and rear first, second and third storey decks.

    70 m away · filed Feb 8, 2024 · Refused

  • 6 Walter St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new rear ground floor addition, a rear yard ground floor deck with stairs, a new side (south) ground floor entrance with a landing and rear and front facing stairs accessed by the driveway.

    200 m away · filed Jul 22, 2023 · Approved

  • 340 Lee Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a balcony. Also, to reconstruct the rear ground level raised deck.

    250 m away · filed Jul 10, 2023 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.