Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

48 Glenview Ave

The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Revision to original permit - during excavation for rear corner addition, it was discovered that this house is in part resting on fill materals. Revise structural support of the entire house which required layout changes, plumbing and hvac changes as well as walkout and deck design changes

    Applied Dec 23, 2020 · issued Feb 17, 2021 · completed Feb 9, 2022 · Permit 19 150412 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing - Revision to original permit - during excavation for rear corner addition, it was discovered that this house is in part resting on fill materals. Revise structural support of the entire house which required layout changes, plumbing and hvac changes as well as walkout and deck design changes

    Applied Dec 23, 2020 · issued Dec 31, 2020 · completed Mar 23, 2022 · Permit 19 150412 PLB (revision 01)

    Closed
  • Small residential project · Multiple projects

    Revision to original permit - during excavation for rear corner addition, it was discovered that this house is in part resting on fill materals. Revise structural support of the entire house which required layout changes, plumbing and hvac changes as well as walkout and deck design changes

    Applied Dec 23, 2020 · issued Feb 11, 2021 · completed Jun 30, 2022 · Permit 19 150412 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - New two storey rear addition, One storey front addition, new attic addition over existing dwelling, interior alterations and new rear walkout and deck,

    Applied Feb 4, 2020 · issued Feb 11, 2020 · completed Feb 9, 2022 · Permit 19 150412 HVA

    Closed
  • Plumbing

    Plumbing - New two storey rear addition, One storey front addition, new attic addition over existing dwelling, interior alterations and new rear walkout and deck,

    Applied May 7, 2019 · issued Jan 28, 2020 · completed Mar 23, 2022 · Permit 19 150412 PLB

    Closed
  • Small residential project · Multiple projects

    New two storey rear addition, One storey front addition, new attic addition over existing dwelling, interior alterations and new rear walkout and deck,

    Applied May 7, 2019 · issued Jan 28, 2020 · completed Jun 30, 2022 · Permit 19 150412 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new third storey addition, a new ground floor and second storey addition and a proposed rear deck and enclosed front porch.

    Decision: Approved (hearing Aug 17, 2017)

    Filed Jun 7, 2017 · File A0569/17NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 81 Glenview Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey front (north) addition and a vestibule with a new entry platform on the east side.

    190 m away · filed Aug 28, 2026 · Hearing scheduled

  • 47 Glenview Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage.

    60 m away · filed Sep 17, 2025 · Approved

  • 2851 Yonge St · Minor variance

    To seek amendment to a previously approved 7-Storey mid-rise building to increase the number of units, height, and gross floor area and modify building setbacks and decrease the number of parking spaces. Note: This application was previously deferred at the Committee of Adjustment hearing on August 28, 2025.

    220 m away · filed Jul 3, 2025 · Approved

  • 28 Chatsworth Dr · Minor variance

    To legalize and maintain the pool cabana in the rear yard and the front and rear yard landscaping.

    200 m away · filed Mar 24, 2025 · Approved

  • 844 Duplex Ave · Minor variance

    To enclose the existing front porch and construct new stairs.

    120 m away · filed Aug 15, 2024 · Approved

  • 67 Glenview Ave · Minor variance

    To construct a two-storey addition to the rear of the existing dwelling.

    110 m away · filed Jun 17, 2024 · Approved

  • 8 Glengrove Ave W · Minor variance

    To construct an accessory structure (pool cabana) in the rear yard of the subject property.

    160 m away · filed Jan 24, 2024 · Approved

  • 54 Glenview Ave · Minor variance

    To construct a new dwelling.

    30 m away · filed Mar 9, 2023 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.