Toronto address · Ward 4, Parkdale-High Park
48 Triller Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve in main line.
Applied Jun 7, 2018 · issued Jun 7, 2018 · completed Jun 8, 2018 · Permit 18 173552 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Submitted
- Approved
89-91 Beaty Avenue and 1497-1501 Queen Street West
7 storeys · 141 homes · Mixed use
260 m away · Rezoning · Approved · filed Feb 17, 2026
- Under review
14 storeys · Residential
480 m away · Site plan · Under review · filed Mar 10, 2026
Neighbours’ Committee of Adjustment files within 250 m
104 Marion St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing third storey dormers (east and west sides), a partial rear one-storey addition, and a rear ground floor deck with stairs.
240 m away · filed Nov 14, 2025 · Approved
79 Wilson Park Rd · Minor variance
To convert the existing rear one-storey ancillary building (detached garage) into a two-storey garden suite by constructing a second storey addition (cantilevered on the west side) and interior alterations, in the rear yard of the existing two-and-one-half-storey semi-detached dwelling. There will be a total of six residential dwelling units on the lot (five units within the main dwelling and one within the ancillary building). No parking spaces will be provided on-site.
200 m away · filed Jul 25, 2025 · Approved
122 Marion St · Minor variance
To convert the existing two-storey, two-unit detached dwelling with a secondary suite in the basement, into a single-family dwelling, by constructing a rear and partial side two-storey addition with a rear ground floor deck, and a second storey balcony. The existing garage in the rear yard will be maintained and unaltered.
240 m away · filed Jun 29, 2024 · Approved
43 Callender St · Minor variance
To convert the two-and-one-half-storey semi-detached dwelling with two residential dwelling units into four residential dwelling units (fourplex) by constructing a rear three-storey addition with a rear three-storey deck. Also, to construct a new ground floor front porch, a front basement walkout, and side (north) exterior access stairs (providing access to the second and third storeys). The existing ancillary building (detached garage) abutting the laneway, in the rear yard, will be demolished.
210 m away · filed May 6, 2024 · Deferred
133 Marion St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear ground floor deck, as well as a patio, and a one-storey ancillary structure (shed), in the rear yard of the property. The existing rear detached garage will be demolished, and a new rear parking pad will be constructed.
220 m away · filed Mar 26, 2024 · Approved
57 Callender St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear two-storey addition (at the northeast portion of the dwelling).
240 m away · filed Mar 18, 2024 · Approved
14 Grafton Ave · Minor variance
To alter the existing one-and-one-half storey detached dwelling by constructing a complete second storey addition, a modified covered front porch (opening 3 sides of the existing enclosed porch), and a new rear basement walkout.
80 m away · filed Jan 25, 2024 · Approved
151 Marion St · Minor variance
To alter the existing two-and-one-half-storey mixed-use building by constructing a rear one-storey addition (for commercial use) with a second storey rooftop deck (for residential use).
250 m away · filed Aug 2, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.