Toronto address · Ward 5, York South-Weston
5 Bellevue Cres
The City of Toronto has 18 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Balcony/Guard repairs
Proposal for localized repairs to balcony slab and railing due to fire damage (Unit 805).
Applied Jul 3, 2026 · issued Jul 16, 2026 · Permit 26 195356 BLD
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposal for localized concrete repairs and re-waterproofing of structural concrete slabs.
Applied Sep 5, 2025 · issued Oct 1, 2025 · Permit 25 220713 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposed Structural work to support realted mechanical permit - To replace ex gas-fired make-up air unit with new, and associated supply air grilles. Update building automation system (See 25-145721 MSA 00 MS)
Applied Aug 7, 2025 · issued Aug 25, 2025 · Permit 25 206764 BLD
- Permit issued
Heating and ventilation
Proposal to replace ex gas-fired make-up air unit with new, and associated supply air grilles. Update building automation system.
Applied Apr 16, 2025 · issued May 29, 2025 · Permit 25 145721 MSA
- Closed
Addition or alteration · Other
Proposed localized concrete repairs in the garage exit stairwells.
Applied Dec 19, 2023 · issued Feb 7, 2024 · completed Oct 28, 2024 · Permit 23 237341 BLD
- Closed
Addition or alteration · Balcony/Guard repairs
Proposal for isolated repairs to the fire damaged balcony structure and replacement of existing damaged railing in an existing apartment building.
Applied Nov 24, 2022 · issued Jun 16, 2023 · completed Jul 27, 2026 · Permit 22 232788 BLD
- Closed
Fire and security upgrade · Sprinklers
Sprinkler upgrade throughout underground parking garage.
Applied Sep 14, 2022 · issued Oct 20, 2022 · completed Sep 18, 2023 · Permit 22 203546 FSU
- Closed
Addition or alteration · Other
Replace diesel life safety generator with natural gas fire
Applied Jul 17, 2021 · issued Sep 20, 2022 · completed Jun 23, 2023 · Permit 21 185661 BLD
- Closed
Heating and ventilation
HVAC - Replace diesel life satety generator with natural gas fired on the roof
Applied Jul 17, 2021 · issued Sep 21, 2022 · completed Jun 12, 2023 · Permit 21 185661 HVA
- Closed
Addition or alteration · Other
REvision 01: change resulting from existing site condition - see attached letter and drawings.Proposal to install CHP Units on the rooftop of an apartment building and connect to existing electrical and hydronic heating systems.REvision 01: change resulting from existing site condition - see attached letter and drawings.
Applied May 1, 2021 · issued Jun 7, 2021 · completed May 25, 2022 · Permit 20 222943 BLD (revision 01)
- Closed
Addition or alteration · Other
Proposal to install CHP Units on the rooftop of an apartment building and connect to existing electrical and hydronic heating systems.
Applied Nov 26, 2020 · issued Jan 12, 2021 · completed May 25, 2022 · Permit 20 222943 BLD
- Closed
Heating and ventilation
HVAC - Proposal to install CHP Units on the rooftop of an apartment building and connect to existing electrical and hydronic heating systems.
Applied Nov 26, 2020 · issued Jan 12, 2021 · completed Feb 28, 2022 · Permit 20 222943 HVA
Show 6 more permits
- Inspections under way
Plumbing · Fixtures/Roof Drains: other
Stand alone plumbing permit to add a laundry sink in the laundry room of an existing apartment building.
Applied Nov 9, 2016 · issued Nov 22, 2016 · Permit 16 249383 PSA
- Inspections under way
Plumbing · Piping: other buildings
Plumbing alterations due to Laundry Room renovation to Community Housing Appartment Building.
Applied Aug 14, 2014 · issued Sep 15, 2014 · Permit 14 206846 PSA
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposal for underground garage repairs in an existing community housing apartment building.
Applied Apr 25, 2014 · issued Jul 17, 2014 · Permit 14 147388 BLD
- Closed (dormant)
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Boiler retrofit Remove 4 boilers and add 6 new hi efficiency boilers in mechanical room on roof
Applied Nov 10, 2009 · issued Dec 17, 2009 · completed Jun 8, 2026 · Permit 09 187190 MSA
- Closed (dormant)
Addition or alteration · Interior alterations
Minor renovations/repairs to lobby of an existing 21-storey Appartment Building.
Applied Sep 22, 2006 · issued Oct 23, 2006 · completed Jun 8, 2026 · Permit 06 178050 BLD
- Closed (dormant)
Fire and security upgrade · Fire alarm
Replace fire alarm system, voice communication system and upgrade alarm audibility
Applied Jul 24, 2002 · issued Sep 3, 2002 · completed Jun 8, 2026 · Permit 02 157372 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
45 storeys · 562 homes · Mixed use
60 m away · Site plan · Under review · filed Dec 23, 2022
- Under review
- Under review
45 storeys · Mixed use
110 m away · Site plan · Under review · filed Apr 19, 2022
- Under review
40 storeys · Mixed use
150 m away · Site plan · Under review · filed Feb 17, 2023
- Under review
- Under review
38 storeys · 421 homes · Mixed use
350 m away · Condominium · Under review · filed Feb 17, 2022
Neighbours’ Committee of Adjustment files within 250 m
1818 Weston Rd · Consent
120 m away · filed Sep 24, 2020 · Application withdrawn
1818 Weston Rd · Minor variance
120 m away · filed Sep 24, 2020 · Postponed
1906-1930 Weston Rd · Minor variance
To convert the existing commercial space on the second floor into 10 new residential units and to create three new residential units on the 13th floor. The building will contain a total of 123 residential units.
210 m away · filed Oct 17, 2019 · Approved
1906-1930 Weston Rd · Minor variance
To convert the existing commercial space on the second floor into 10 new residential units, and to add three new residential units on the 13th floor. The building will contain a total of 123 residential units.
210 m away · filed Dec 21, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.