Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

5 Bellevue Cres

The City of Toronto has 18 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Balcony/Guard repairs

    Proposal for localized repairs to balcony slab and railing due to fire damage (Unit 805).

    Applied Jul 3, 2026 · issued Jul 16, 2026 · Permit 26 195356 BLD

    Permit issued
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for localized concrete repairs and re-waterproofing of structural concrete slabs.

    Applied Sep 5, 2025 · issued Oct 1, 2025 · Permit 25 220713 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Proposed Structural work to support realted mechanical permit - To replace ex gas-fired make-up air unit with new, and associated supply air grilles. Update building automation system (See 25-145721 MSA 00 MS)

    Applied Aug 7, 2025 · issued Aug 25, 2025 · Permit 25 206764 BLD

    Permit issued
  • Heating and ventilation

    Proposal to replace ex gas-fired make-up air unit with new, and associated supply air grilles. Update building automation system.

    Applied Apr 16, 2025 · issued May 29, 2025 · Permit 25 145721 MSA

    Permit issued
  • Addition or alteration · Other

    Proposed localized concrete repairs in the garage exit stairwells.

    Applied Dec 19, 2023 · issued Feb 7, 2024 · completed Oct 28, 2024 · Permit 23 237341 BLD

    Closed
  • Addition or alteration · Balcony/Guard repairs

    Proposal for isolated repairs to the fire damaged balcony structure and replacement of existing damaged railing in an existing apartment building.

    Applied Nov 24, 2022 · issued Jun 16, 2023 · completed Jul 27, 2026 · Permit 22 232788 BLD

    Closed
  • Fire and security upgrade · Sprinklers

    Sprinkler upgrade throughout underground parking garage.

    Applied Sep 14, 2022 · issued Oct 20, 2022 · completed Sep 18, 2023 · Permit 22 203546 FSU

    Closed
  • Addition or alteration · Other

    Replace diesel life safety generator with natural gas fire

    Applied Jul 17, 2021 · issued Sep 20, 2022 · completed Jun 23, 2023 · Permit 21 185661 BLD

    Closed
  • Heating and ventilation

    HVAC - Replace diesel life satety generator with natural gas fired on the roof

    Applied Jul 17, 2021 · issued Sep 21, 2022 · completed Jun 12, 2023 · Permit 21 185661 HVA

    Closed
  • Addition or alteration · Other

    REvision 01: change resulting from existing site condition - see attached letter and drawings.Proposal to install CHP Units on the rooftop of an apartment building and connect to existing electrical and hydronic heating systems.REvision 01: change resulting from existing site condition - see attached letter and drawings.

    Applied May 1, 2021 · issued Jun 7, 2021 · completed May 25, 2022 · Permit 20 222943 BLD (revision 01)

    Closed
  • Addition or alteration · Other

    Proposal to install CHP Units on the rooftop of an apartment building and connect to existing electrical and hydronic heating systems.

    Applied Nov 26, 2020 · issued Jan 12, 2021 · completed May 25, 2022 · Permit 20 222943 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to install CHP Units on the rooftop of an apartment building and connect to existing electrical and hydronic heating systems.

    Applied Nov 26, 2020 · issued Jan 12, 2021 · completed Feb 28, 2022 · Permit 20 222943 HVA

    Closed
Show 6 more permits
  • Plumbing · Fixtures/Roof Drains: other

    Stand alone plumbing permit to add a laundry sink in the laundry room of an existing apartment building.

    Applied Nov 9, 2016 · issued Nov 22, 2016 · Permit 16 249383 PSA

    Inspections under way
  • Plumbing · Piping: other buildings

    Plumbing alterations due to Laundry Room renovation to Community Housing Appartment Building.

    Applied Aug 14, 2014 · issued Sep 15, 2014 · Permit 14 206846 PSA

    Inspections under way
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for underground garage repairs in an existing community housing apartment building.

    Applied Apr 25, 2014 · issued Jul 17, 2014 · Permit 14 147388 BLD

    Permit issued
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Boiler retrofit Remove 4 boilers and add 6 new hi efficiency boilers in mechanical room on roof

    Applied Nov 10, 2009 · issued Dec 17, 2009 · completed Jun 8, 2026 · Permit 09 187190 MSA

    Closed (dormant)
  • Addition or alteration · Interior alterations

    Minor renovations/repairs to lobby of an existing 21-storey Appartment Building.

    Applied Sep 22, 2006 · issued Oct 23, 2006 · completed Jun 8, 2026 · Permit 06 178050 BLD

    Closed (dormant)
  • Fire and security upgrade · Fire alarm

    Replace fire alarm system, voice communication system and upgrade alarm audibility

    Applied Jul 24, 2002 · issued Sep 3, 2002 · completed Jun 8, 2026 · Permit 02 157372 FSU

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 1828-1844 Weston Road

    45 storeys · 562 homes · Mixed use

    60 m away · Site plan · Under review · filed Dec 23, 2022

    Under review
  • 1865-1885 Weston Road

    Residential

    110 m away · Site plan · Under review · filed Dec 28, 2022

    Under review
  • 1821-1831 Weston Road

    45 storeys · Mixed use

    110 m away · Site plan · Under review · filed Apr 19, 2022

    Under review
  • 1798-1812 Weston Road

    40 storeys · Mixed use

    150 m away · Site plan · Under review · filed Feb 17, 2023

    Under review
  • 21 John Street

    42 storeys · Mixed use

    290 m away · Site plan · Under review · filed Apr 25, 2023

    Under review
  • 1736-1746 Weston Road

    38 storeys · 421 homes · Mixed use

    350 m away · Condominium · Under review · filed Feb 17, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 1818 Weston Rd · Consent

    120 m away · filed Sep 24, 2020 · Application withdrawn

  • 1818 Weston Rd · Minor variance

    120 m away · filed Sep 24, 2020 · Postponed

  • 1906-1930 Weston Rd · Minor variance

    To convert the existing commercial space on the second floor into 10 new residential units and to create three new residential units on the 13th floor. The building will contain a total of 123 residential units.

    210 m away · filed Oct 17, 2019 · Approved

  • 1906-1930 Weston Rd · Minor variance

    To convert the existing commercial space on the second floor into 10 new residential units, and to add three new residential units on the 13th floor. The building will contain a total of 123 residential units.

    210 m away · filed Dec 21, 2017 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.