Toronto address · Ward 8, Eglinton-Lawrence
50 Glencairn Ave
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services
Drain - Drain scope includes Back Water Valve and Sump Pump. Proposed new two storey rear addition to existing single family dwelling with two new deck and new garage.
Applied Apr 10, 2019 · issued Apr 10, 2019 · completed Jan 6, 2021 · Permit 18 179848 DRN
- Closed
Heating and ventilation
HVAC - Proposed new two storey rear addition to existing single family dwelling with two new deck and new garage
Applied Nov 23, 2018 · issued Dec 6, 2018 · completed Jan 6, 2021 · Permit 18 179848 HVA
- Closed
Plumbing
Plumbing - Proposed new two storey rear addition to existing single family dwelling with two new deck and new garage
Applied Nov 23, 2018 · issued Nov 26, 2018 · completed Nov 3, 2020 · Permit 18 179848 PLB
- Closed
Small residential project · Multiple projects
Proposed new two storey rear addition to existing single family dwelling with two new deck and new garage
Applied Jun 18, 2018 · issued Sep 5, 2018 · completed Jan 5, 2021 · Permit 18 179848 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a new two-storey rear addition including an attached garage at the rear of the existing two-storey dwelling. The existing one-storey rear addition would be demolished.
Decision: Approved (hearing Jul 6, 2017)
Filed Apr 20, 2017 · File A0407/17NY
What’s planned nearby
Development sites within 500 m
- Approved
2674-2704 Yonge Street and 19 Alexandra Boulevard
13 storeys · 208 homes · Residential
260 m away · Site plan · Approved · filed Nov 4, 2025
- Under review
Neighbours’ Committee of Adjustment files within 250 m
81 Glenview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey front (north) addition and a vestibule with a new entry platform on the east side.
230 m away · filed Aug 28, 2026 · Hearing scheduled
84 Alexandra Blvd · Minor variance
To construct a one storey rear addition to the existing dwelling.
170 m away · filed Mar 3, 2026 · Approved
83 Glengrove Ave W · Minor variance
To construct a covered terrace at the rear of the existing dwelling.
140 m away · filed Oct 17, 2025 · Approved
47 Glenview Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage.
220 m away · filed Sep 17, 2025 · Approved
844 Duplex Ave · Minor variance
To enclose the existing front porch and construct new stairs.
190 m away · filed Aug 15, 2024 · Approved
64 Alexandra Blvd · Minor variance
To construct a new 2 storey dwelling.
120 m away · filed Jun 25, 2024 · Approved
67 Glenview Ave · Minor variance
To construct a two-storey addition to the rear of the existing dwelling.
210 m away · filed Jun 17, 2024 · Approved
71 Alexandra Blvd · Minor variance
To construct a new detached dwelling and a garden suite
170 m away · filed Apr 26, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.