Toronto address · Ward 10, Spadina-Fort York
500 Wellington St W
The City of Toronto has 20 building permits since 2017 (11 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
New building
REV : The proposed revision work is clarifying that access from the parking area (ground floor) to the interior space is no longer barrier free.
Applied Sep 9, 2025 · issued Dec 3, 2025 · Permit 09 163893 BLD (revision 01)
- Closed
Addition or alteration · Balcony/Guard repairs
Proposal to add retractable glazing to perimeter of existing condo balcony
Applied Apr 28, 2022 · issued May 20, 2022 · completed May 10, 2023 · Permit 22 139851 BLD
- Permit issued
Addition or alteration · Interior alterations
Add retractable glazing to perimeter of the existing condominium balcony in suite 602
Applied Sep 8, 2021 · issued Oct 5, 2021 · Permit 21 209555 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations to existing condo unit 901
Applied Sep 9, 2019 · issued Oct 8, 2019 · Permit 18 271096 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to existing condo unit 901
Applied Dec 21, 2018 · issued Jan 30, 2019 · Permit 18 271096 BLD
- Closed
Plumbing
Plumbing - Proposed interior alterations to existing condo unit 901
Applied Dec 21, 2018 · issued Jan 30, 2019 · completed Jan 13, 2026 · Permit 18 271096 PLB
- Closed
Addition or alteration · Addition(s)
Proposed new addition by enclosing and adding glazing system to balcony on the 3rd floor unit 302
Applied Jan 9, 2018 · issued Mar 9, 2018 · completed Jan 10, 2019 · Permit 18 102809 BLD
- Closed
Addition or alteration · Other
Proposal to add glazing system to balcony - Unit 402
Applied Dec 20, 2017 · issued Jan 2, 2018 · completed Oct 3, 2018 · Permit 17 277720 BLD
- Closed
Addition or alteration · Balcony/Guard repairs
add glazing system to balcony
Applied May 4, 2016 · issued Jun 1, 2016 · completed Sep 25, 2017 · Permit 16 150465 BLD
- Closed
Addition or alteration · Balcony/Guard repairs
Proposal to add glazing system to balcony.
Applied May 3, 2016 · issued Jun 1, 2016 · completed Oct 10, 2017 · Permit 16 149617 BLD
- Closed
Addition or alteration · Balcony/Guard repairs
Proposal to add glazing system to balcony.
Applied May 3, 2016 · issued Jun 1, 2016 · completed Oct 10, 2017 · Permit 16 149695 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
proposal to install 1 maglock at the front entrance
Applied Nov 23, 2012 · issued Dec 17, 2012 · completed Feb 26, 2026 · Permit 12 283984 FSU
Show 8 more permits
- Revision issued
Heating and ventilation
Revision to HVAC permit for Measure N vestibule.
Applied Jan 18, 2012 · issued Feb 2, 2012 · Permit 09 163893 HVA (revision 01)
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal to construct a 10 sty condo (16 residential units) with 1 level of below grade parking.
Applied Jan 18, 2012 · Permit 09 163893 FSU
- Inspections under way
Fire and security upgrade · Sprinklers
Sprinkler permit in conjunction with 09 163893 BLD.
Applied Nov 4, 2010 · issued Mar 9, 2011 · Permit 10 291243 FSU
- Permit issued
Partial permit · Partial permit - structural framing
Part Permit - Proposal to construct a 10 sty condo (16 residential units) with 1 level of below grade parking.
Applied May 14, 2010 · issued Jan 19, 2012 · Permit 09 163893 STR
- Permit issued
Drains and site services
Drain - Proposal to construct a 10 sty condo (16 residential units) with 1 level of below grade parking.
Applied May 6, 2010 · issued Feb 7, 2011 · Permit 09 163893 DRN
- Inspections under way
New building
Proposal to construct a 10 sty condo (16 residential units) with 1 level of below grade parking.
Applied Aug 31, 2009 · issued Jan 19, 2012 · 16 homes added · Permit 09 163893 BLD
- Closed
Plumbing
Plumbing - Proposal to construct a 10 sty condo (16 residential units) with 1 level of below grade parking.
Applied Aug 31, 2009 · issued Feb 7, 2011 · completed Oct 21, 2025 · Permit 09 163893 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a 10 sty condo (16 residential units) with 1 level of below grade parking.
Applied Aug 31, 2009 · issued Mar 9, 2011 · Permit 09 163893 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
15 storeys · 134 homes · Mixed use
60 m away · Site plan · Approved · filed Dec 17, 2021
- Under review
23 storeys · 225 homes · Mixed use
70 m away · Site plan · Under review · filed Jul 20, 2022
- Under review
485-489 Wellington Street West
117 homes · Residential
70 m away · Condominium · Under review · filed Nov 4, 2021
- Under review
439 homes · Residential
110 m away · Condominium · Under review · filed May 14, 2025
- Approved
9 storeys · Residential
150 m away · Site plan · Approved · filed Dec 23, 2022
- Under review
1-9 Niagara Street and 18 Portland Street
22 storeys · 182 homes · Mixed use
170 m away · Site plan · Under review · filed Sep 8, 2022
Neighbours’ Committee of Adjustment files within 250 m
578 King St W · Minor variance
To alter the development standards for the nine-storey office building, as approved under Site Specific By-law 718-2025 (OLT), by converting to a hotel and retail use, constructing an interstitial level at the second storey, increasing the number of storeys to 11 storeys (with a building height of 43.39 m, inclusive of the mechanical penthouse), and increasing the non-residential gross floor area for this lot (6,273.5 square metres). This site has heritage designation. A Site Plan Control application (File Number 22 242134 STE 10 SA ) is currently under review.
150 m away · filed Nov 18, 2025 · Postponed
485 Wellington St W · Minor variance
To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equip…
70 m away · filed Jul 3, 2025 · Deferred
462 Wellington St W · Minor variance
To alter the development standards for the 15-storey (50 m) mixed-use building (as approved under Site Specific Zoning By-Law 1047-2022), by increasing the overall height, number of dwelling units, and residential gross floor area, and to reduce loading and bicycle parking spaces.
70 m away · filed Nov 12, 2024 · Approved
530 Front St W · Minor variance
To permit the undersized loading spaces (Type C) in the parking level of a 15 storey mixed-use building (currently under construction).
200 m away · filed Mar 27, 2024 · Approved
54 Stewart St · Consent
To obtain consent for the technical severance of the property for the purposes of re-establishing two residential lots which merged on title, as well as maintaining existing easements/rights-of-way.
250 m away · filed Jan 19, 2024 · Approved
582 King St W · Minor variance
To amend the development standards for the redevelopment of the site (as approved under Site Specific Zoning By-law 1116-2022 OLT) to permit an eating establishment use on this site.
150 m away · filed Jul 21, 2023 · Approved
480 Front St W · Minor variance
To permit a new eating establishment with an entertainment area (bowling alley) on Level P2 of Building D ("The Well").
210 m away · filed Jul 19, 2022 · Approved
489 King St W · Consent
To obtain consent to create an easement/right-of-way.
190 m away · filed Jun 9, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.