Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

503 Oakwood Ave

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed addition of washroom on main floor to be used an board room/office, and drywall work

    Applied Oct 31, 2022 · issued Dec 6, 2022 · Permit 22 224066 PLB

    Revocation pending
  • Addition or alteration · Interior alterations

    Proposed addition of washroom on main floor to be used an board room/office, and drywall work

    Applied Oct 31, 2022 · issued Dec 6, 2022 · Permit 22 224066 BLD

    Revocation pending
  • Plumbing · Fixtures/Roof Drains: other

    Proposed addition of washroom to main floor. Area to be used as a board room/office.

    Applied Sep 19, 2022 · completed Oct 31, 2022 · Permit 22 205795 PSA

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 44 Amherst Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a side (east) fire shutter, and a front second storey canopy covering the existing balcony.

    250 m away · filed Jul 7, 2026 · Approved

  • 88 Bude St · Minor variance

    180 m away · filed May 14, 2026 · Postponed

  • 636 Vaughan Rd · Minor variance

    To construct a new patio (for the existing eating establishment) in the rear yard of the existing two-storey mixed-use building. Also, to construct a canopy for the new patio in the rear yard.

    70 m away · filed Oct 21, 2025 · Postponed

  • 47 Clovelly Ave · Minor variance

    To legalize and to maintain the conversion of the below-grade integral garage into habitable space, as well as the conversion of the existing two-storey detached dwelling into a triplex, without an authorized building permit. There are three residential dwelling units on this site.

    220 m away · filed Aug 22, 2025 · Refused

  • 22 Strader Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front one-storey addition (including a walkout basement), and a complete second floor addition with a front balcony. Also, to reconstruct the covered front porch with stairs. There will be a total of two residential dwelling units on this lot.

    110 m away · filed Jun 11, 2025 · Approved

  • 118 Bude St · Minor variance

    To construct a two-storey ancillary building (containing one garden suite) in the rear yard of the property. There will be a total of three residential dwelling units on this lot (two units occupying the main dwelling and one unit occupying the ancillary building). The existing sheds will be demolished.

    220 m away · filed May 30, 2025 · Approved

  • 327 Robina Ave · Minor variance

    To construct a new two-storey detached dwelling with a covered front porch, an integral garage, a front second storey balcony, a rear ground floor deck with stairs, and a rear basement walkout.

    250 m away · filed Nov 18, 2024 · Approved

  • 61 Clovelly Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with front and rear basement patios, front and rear ground floor porch with stairs, a rear second floor balcony, and a rear third storey platform.

    210 m away · filed Nov 7, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.