Toronto address · Ward 3, Etobicoke-Lakeshore
51 Enfield Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision # 01 - To the Insulation in the existing single family dwelling.Proposed second floor addition, two storey rear addition with attached garage, interior alterations and new porch for existing one storey single family dwelling.
Applied Dec 3, 2020 · issued Jan 21, 2021 · completed Dec 3, 2021 · Permit 19 115895 BLD (revision 01)
- Closed
Drains and site services
Drain - Proposed second floor addition, two storey rear addition with attached garage, interior alterations and new porch for existing one storey single family dwelling.
Applied Feb 15, 2019 · issued Apr 30, 2019 · completed Dec 3, 2021 · Permit 19 115895 DRN
- Closed
Heating and ventilation
HVAC - Proposed second floor addition, two storey rear addition with attached garage, interior alterations and new porch for existing one storey single family dwelling.
Applied Feb 15, 2019 · issued Apr 30, 2019 · completed Dec 3, 2021 · Permit 19 115895 HVA
- Closed
Plumbing
Plumbing - Proposed second floor addition, two storey rear addition with attached garage, interior alterations and new porch for existing one storey single family dwelling.
Applied Feb 15, 2019 · issued Apr 30, 2019 · completed Dec 3, 2021 · Permit 19 115895 PLB
- Closed
Small residential project · Multiple projects
Proposed second floor addition, two storey rear addition with attached garage, interior alterations and new porch for existing one storey single family dwelling.
Applied Feb 15, 2019 · issued Apr 30, 2019 · completed Dec 3, 2021 · Permit 19 115895 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition above the existing dwelling and a two-storey rear addition with an integral garage.
Decision: Approved (hearing Jun 21, 2018)
Filed Mar 15, 2018 · File A0263/18EYK
What’s planned nearby
Development sites within 500 m
- Approved
20 Brow Drive and 3850 Lake Shore Boulevard West
Not stated in the file
230 m away · Site plan · Approved · filed Oct 14, 2022
- Under appeal
3807-3829 Lake Shore Boulevard West
39 storeys · 490 homes · Mixed use
420 m away · Rezoning · Under appeal · filed Dec 6, 2022
Neighbours’ Committee of Adjustment files within 250 m
57 Enfield Ave · Minor variance
To construct a rear one-storey addition to the existing dwelling.
30 m away · filed Jun 27, 2025 · Approved
18 Gort Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
140 m away · filed Mar 31, 2025 · Approved
18 Gort Ave · Minor variance
To construct a new detached dwelling with an attached garage.
140 m away · filed Mar 31, 2025 · Approved
18 Gort Ave · Minor variance
To construct a new detached dwelling with an attached garage.
140 m away · filed Mar 31, 2025 · Approved
21 Gort Ave · Minor variance
To legalize and to maintain the existing dwelling and existing detached garage in the rear yard that are currently under construction. A previous Committee of Adjustment application (A0223/23EYK) approved variances related to lot area, gross floor area, height, side yard setback and driveway width.
200 m away · filed Jun 18, 2024 · Approved
16 Gort Ave · Minor variance
To construct a covered deck in the rear yard.
140 m away · filed Jun 13, 2024 · Approved
8 Gort Ave · Minor variance
To construct a second storey addition.
120 m away · filed Jul 19, 2023 · Approved
21 Gort Ave · Minor variance
To construct a new detached dwelling with a new detached garage.
200 m away · filed May 30, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.