Toronto address · Ward 14, Toronto-Danforth
52 De Grassi St
The City of Toronto has 8 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REVISION - revised drawings, 2nd suiteHVAC - Ground floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied Jun 19, 2025 · issued Jun 25, 2025 · Permit 24 208802 HVA (revision 01)
- Revision issued
Small residential project · Multiple projects
Rev 02 (as bubbled) - Sturctural revisions in basement, ground floor and second floor, new fire rated walls in ground floor, and addition to second floor area (57.48 sq. m)Proposed second suite in basementGround floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied May 15, 2025 · issued Jun 6, 2025 · Permit 24 208802 BLD (revision 02)
- Revision issued
Plumbing
Rev. 01- Revision related to the second floor addition. - See 24 208802 BLD 02 SR.Plumbing - Ground floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied May 15, 2025 · issued May 20, 2025 · Permit 24 208802 PLB (revision 01)
- Revision issued
Small residential project · Multiple projects
Rev 01 (as bubbled) Proposed second suite in basementGround floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied Dec 11, 2024 · issued Mar 7, 2025 · 1 home added · Permit 24 208802 BLD (revision 01)
- Closed
Drains and site services
Drain - Ground floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied Sep 6, 2024 · issued Sep 16, 2024 · completed Oct 15, 2025 · Permit 24 208802 DRN
- Inspections under way
Small residential project · Multiple projects
Ground floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied Sep 6, 2024 · issued Sep 16, 2024 · Permit 24 208802 BLD
- Inspections under way
Heating and ventilation
HVAC - Ground floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied Sep 6, 2024 · issued Sep 23, 2024 · Permit 24 208802 HVA
- Inspections under way
Plumbing
Plumbing - Ground floor addition on a concrete foundation with a full interior alteration to the ground floor, second floor addition, basement underpinning with a full interior alteration.
Applied Sep 6, 2024 · issued Sep 16, 2024 · Permit 24 208802 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
6 storeys · 15 homes · Mixed use
180 m away · Site plan · Approved · filed Apr 28, 2023
- Approved
9 storeys · 78 homes · Mixed use
480 m away · Site plan · Approved · filed May 3, 2023
- Under appeal
18-40 Lewis Street, 21-53 Broadview Avenue and 344 Eastern Avenue
12 storeys · 340 homes · Mixed use
490 m away · Site plan · Under appeal · filed Jul 5, 2022
Neighbours’ Committee of Adjustment files within 250 m
786-788 Queen St E · Minor variance
To construct a new six-storey mixed-use building (with stepping down of heights towards the rear lot line), containing 15 residential dwelling units, and one commercial unit (to be located on the ground level).
180 m away · filed Dec 19, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.
170 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling.
170 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.
170 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Consent
To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.
170 m away · filed Jan 24, 2024 · Approved
25 Grant St · Minor variance
To construct a new two-storey detached rear ancillary building (containing one laneway suite), with a partially cantilevered (west) second storey, a covered (west) porch with stairs, and a side (north) second storey balcony. Also, to construct one rear parking space abutting the public lane. There will be a total of two residential dwelling units on this lot (one unit occupying the existing two-and-one-half-storey townhouse main dwelling and one unit occupying the ancillary building).
210 m away · filed Feb 24, 2023 · Approved
12 Boulton Ave · Minor variance
To alter the existing two-storey dwelling by constructing a rear two-storey addition with a first storey deck.
140 m away · filed Feb 24, 2023 · Approved
8 De Grassi St · Minor variance
To construct a 6-storey mixed-use building, including 1 commercial unit on the ground floor and 15 residential units with a mix of bedroom types, front second to sixth storey balconies, a rooftop amenity space with an access, and a mechanical penthouse. This application is associated with Site Plan Application # 17 279888 STE 30 SA that is under review.
130 m away · filed Dec 19, 2022 · Withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.