Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

52 Tiverton Ave

The City of Toronto has 8 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for a third floor rear addition and second floor box bay window. Scope includes interior alterations to the existing ground, second and third floors.

    Applied Apr 30, 2021 · issued May 11, 2021 · Permit 21 136833 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for a third floor rear addition and second floor box bay window. Scope includes interior alterations to the existing ground, second and third floors.

    Applied Apr 7, 2021 · issued May 11, 2021 · Permit 21 136833 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for a third floor rear addition and second floor box bay window. Scope includes interior alterations to the existing ground, second and third floors.

    Applied Apr 7, 2021 · issued May 11, 2021 · Permit 21 136833 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to underpin and finish the basement of the existing single family dwelling.

    Applied Mar 26, 2021 · issued Mar 26, 2021 · Permit 20 228928 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to underpin and finish the basement of the existing single family dwelling.

    Applied Dec 14, 2020 · issued Dec 22, 2020 · completed Apr 22, 2021 · Permit 20 228928 DRN

    Closed
  • Small residential project · Multiple projects

    Proposal to underpin and finish the basement of the existing single family dwelling.

    Applied Dec 14, 2020 · issued Dec 22, 2020 · Permit 20 228928 BLD

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to construct 2 third floor additions by increasing the dormers in an existing 3 storey SFD-detached dwelling. Proposal also includes minor interior alterations on the 3rd floor a new 3rd floor rear balcony.

    Applied Sep 29, 2010 · issued May 26, 2011 · completed Nov 10, 2020 · Permit 10 268232 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct 2 third floor additions by increasing the dormers in an existing 3 storey SFD-detached dwelling. Proposal also includes minor interior alterations on the 3rd floor a new 3rd floor rear balcony.

    Applied Sep 29, 2010 · issued May 26, 2011 · completed Nov 10, 2020 · Permit 10 268232 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 195 De Grassi St · Minor variance

    To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.

    160 m away · filed May 20, 2026 · Approved

  • 821 Gerrard St E · Minor variance

    To convert the existing mixed-use building (one restaurant use on the ground level and one residential dwelling unit on the second level) into a non-residential building (nail salon which will occupy both levels).

    230 m away · filed Jan 15, 2026 · Approved

  • 813 Gerrard St E · Minor variance

    To alter the existing two-storey attached non-residential building by constructing a rear two-storey addition. The existing outdoor patio (seating area) in the rear yard, will be maintained and unaltered.

    220 m away · filed Dec 17, 2024 · Approved

  • 183 First Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a west side third storey addition.

    90 m away · filed Sep 18, 2023 · Approved

  • 1000 Dundas St E · Minor variance

    To alter the existing two-and-a-half storey townhouse by constructing a front third storey addition.

    160 m away · filed Sep 15, 2023 · Approved

  • 228 De Grassi St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition. Also, to construct a new ancillary building (detached garage) in the rear yard, abutting the laneway.

    210 m away · filed Nov 15, 2022 · Approved

  • 130 First Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing the front porch, constructing a new front below-grade retaining wall, and front basement walkout stairs. The existing rear concrete pad will be replaced with a detached ancillary building (garage).

    160 m away · filed Jul 19, 2022 · Approved

  • 176 De Grassi St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a rear three-storey addition, a third storey walkout deck, and a rear ground level deck.

    200 m away · filed May 4, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.