Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

5207 Dundas St W

The City of Toronto has 12 building permits since 2017 (8 still open) and 3 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Alternative solution

    The Alternative Solution is required because the outdoor public pool on the 10th floor is not provided with an 1800mm pool deck on two (2) sides of the pool. See Attachment `A¿ of the outdoor pool which has a minimum 1800mm deck on the entrance side of the pool (long end) and one (1) short end. The two (2) other sides have a deck of 1610mm on opposite long end and 500mm onopposite short end. It is our opinion that the rescue of a bather can be done from three (3) sides of the pool deck even with the reduced widths (1610mm) given the water depth of the pool (1275mm).

    Applied Nov 13, 2025 · Permit 25 253076 ALT

    Under review
  • Partial permit · Partial permit - structural framing

    Part Permit - ONEProposal to construct a two-tower 725-unit purpose built-rental apartment community (including 218 affordable housing units).The first tower will have 25 floors while the second will have 29 floors. There will be two levels of 17 townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Sep 26, 2024 · issued Feb 27, 2026 · completed Feb 27, 2026 · Permit 23 177833 STR

    Closed
  • Partial permit · Partial permit - foundation

    Part Permit - Proposal to construct a two-tower 725-unit purpose built-rental apartment community.The first tower will have 25 floors while the second will have 29 floors. There will be two levels of townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Feb 1, 2024 · completed Nov 1, 2024 · Permit 23 177833 FND

    Cancelled
  • Development charges deferral

    Deferred Fees from folder 23 177833 (RSN-5305726) ZoningProcess RSN 73249485

    Applied Dec 13, 2023 · Permit 23 177833 BLD

    Open
  • Alternative solution

    The project is located in the City of Toronto, on Dundas Street West. The proposed 29 storey Mixed-Use building withretail on the ground floor and residential on the ground to 29th floor. There is 1 (one) level of parking garage belowgrade. The building will be designed in accordance with the OBC Article 3.2.2.42 (Group C, Any Height, Any Area,Sprinklered).The building will be provided with electrically supervised automatic sprinkler protection throughout as per OBC Article3.2.2.42. Furthermore, a fire alarm system connected to a central station will be provided throughout the building.The al…

    Applied Dec 1, 2023 · completed May 13, 2024 · Permit 23 231765 ALT

    Approved
  • Partial permit · Partial permit - shoring

    Part Permit - Proposal to construct a two-tower 725-unit purpose built-rental apartment community.The first tower will have 25 floors while the second will have 29 floors. There will be two levels of townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Aug 16, 2023 · completed Aug 16, 2024 · Permit 23 177833 SHO

    Cancelled
  • Drains and site services · Site service

    Drain - Proposal to construct a two-tower 725-unit purpose built-rental apartment community.The first tower will have 25 floors while the second will have 29 floors. There will be two levels of townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Jul 28, 2023 · Permit 23 177833 STS

    Issuance pending
  • Plumbing

    Plumbing - Proposal to construct a two-tower 725-unit purpose built-rental apartment community.The first tower will have 25 floors while the second will have 29 floors. There will be two levels of townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Jul 21, 2023 · issued Dec 24, 2025 · Permit 23 177833 PLB

    Inspections under way
  • New building

    Proposal to construct a two-tower 725-unit purpose built-rental apartment community (including 218 affordable housing units).The first tower will have 25 floors while the second will have 29 floors. There will be two levels of 17 townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Jul 21, 2023 · issued Feb 27, 2026 · 509 homes added · Permit 23 177833 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a two-tower 725-unit purpose built-rental apartment community.The first tower will have 25 floors while the second will have 29 floors. There will be two levels of townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Jul 21, 2023 · issued Jul 7, 2025 · Permit 23 177833 HVA

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a two-tower 725-unit purpose built-rental apartment community.The first tower will have 25 floors while the second will have 29 floors. There will be two levels of townhouses, 7 to 9 story podium and one level of underground parking as well as another level of mezz underground.

    Applied Jul 21, 2023 · issued Aug 27, 2024 · Permit 23 177833 DRN

    Inspections under way
  • Addition or alteration · Shoring

    Stand alone shoring & Excavation is required for the Soil Remediation of the site

    Applied Dec 20, 2022 · completed Feb 20, 2025 · Permit 22 241091 BLD

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To permit design changes for the proposed sports court facility.

    Decision: Approved (hearing May 28, 2026)

    Filed Apr 16, 2026 · File A0131/26EYK

    Closed
  • Minor variance · New NR building

    To permit design changes for the proposed daycare.

    Decision: Approved (hearing Jan 16, 2025)

    Filed Oct 24, 2024 · File A0426/24EYK

    Closed
  • Minor variance · Other

    To construct two mixed-use buildings.

    Decision: Approved (hearing Dec 8, 2022)

    Filed Oct 14, 2022 · File A0523/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.