Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

53 Eighth St

The City of Toronto has 6 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - proposal for basement underpinning and interior alterations

    Applied Mar 14, 2024 · issued Mar 21, 2024 · Permit 24 125741 PLB

    Inspections under way
  • Small residential project · Multiple projects

    proposal for basement underpinning and interior alterations

    Applied Mar 14, 2024 · issued Mar 21, 2024 · Permit 24 125741 BLD

    Inspections under way
  • Drains and site services

    Drain - proposal for basement underpinning and interior alterations

    Applied Mar 14, 2024 · issued Mar 21, 2024 · completed Apr 29, 2026 · Permit 24 125741 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposal to relocate first and second storey staircase and construct an additional bathroom on the second floor at existing detached, single family dwelling.

    Applied May 12, 2015 · issued May 20, 2015 · Permit 15 147750 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to relocate first and second storey staircase and construct an additional bathroom on the second floor at existing detached, single family dwelling.

    Applied Apr 28, 2015 · issued May 5, 2015 · completed Apr 29, 2026 · Permit 15 147750 PLB

    Closed
  • Small residential project · Interior alterations

    Proposal to relocate first and second storey staircase and construct an additional bathroom on the second floor at existing detached, single family dwelling.

    Applied Apr 28, 2015 · issued May 5, 2015 · completed Apr 29, 2026 · Permit 15 147750 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 73 Tenth St · Minor variance

    To construct a one-storey rear addition and a new rear deck.

    230 m away · filed Dec 2, 2025 · Approved

  • 46 Tenth St · Minor variance

    To maintain the existing front porch that is currently uncer construction.

    230 m away · filed Sep 26, 2025 · Approved

  • 16 Eighth St · Minor variance

    To enclose the existing front porch.

    150 m away · filed Apr 24, 2025 · Approved

  • 62 Seventh St · Minor variance

    To construct a new duplex with an attached garage.

    50 m away · filed Apr 11, 2025 · Refused

  • 69 Tenth St · Minor variance

    To construct a two-storey rear addition including a deck in the rear yard.

    220 m away · filed Aug 9, 2024 · Approved

  • 47 Emerald Cres · Minor variance

    To construct a two-storey east side addition including an attached garage. The altered dwelling will contain a secondary dwelling unit.

    230 m away · filed May 31, 2024 · Hearing scheduled

  • 72 Seventh St · Minor variance

    To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.

    70 m away · filed May 29, 2024 · Approved

  • 62 Seventh St · Minor variance

    To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.

    50 m away · filed May 21, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.