Toronto address · Ward 3, Etobicoke-Lakeshore
53 Eighth St
The City of Toronto has 6 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - proposal for basement underpinning and interior alterations
Applied Mar 14, 2024 · issued Mar 21, 2024 · Permit 24 125741 PLB
- Inspections under way
Small residential project · Multiple projects
proposal for basement underpinning and interior alterations
Applied Mar 14, 2024 · issued Mar 21, 2024 · Permit 24 125741 BLD
- Closed
Drains and site services
Drain - proposal for basement underpinning and interior alterations
Applied Mar 14, 2024 · issued Mar 21, 2024 · completed Apr 29, 2026 · Permit 24 125741 DRN
- Inspections under way
Heating and ventilation
HVAC - Proposal to relocate first and second storey staircase and construct an additional bathroom on the second floor at existing detached, single family dwelling.
Applied May 12, 2015 · issued May 20, 2015 · Permit 15 147750 HVA
- Closed
Plumbing
Plumbing - Proposal to relocate first and second storey staircase and construct an additional bathroom on the second floor at existing detached, single family dwelling.
Applied Apr 28, 2015 · issued May 5, 2015 · completed Apr 29, 2026 · Permit 15 147750 PLB
- Closed
Small residential project · Interior alterations
Proposal to relocate first and second storey staircase and construct an additional bathroom on the second floor at existing detached, single family dwelling.
Applied Apr 28, 2015 · issued May 5, 2015 · completed Apr 29, 2026 · Permit 15 147750 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
73 Tenth St · Minor variance
To construct a one-storey rear addition and a new rear deck.
230 m away · filed Dec 2, 2025 · Approved
46 Tenth St · Minor variance
To maintain the existing front porch that is currently uncer construction.
230 m away · filed Sep 26, 2025 · Approved
16 Eighth St · Minor variance
To enclose the existing front porch.
150 m away · filed Apr 24, 2025 · Approved
62 Seventh St · Minor variance
To construct a new duplex with an attached garage.
50 m away · filed Apr 11, 2025 · Refused
69 Tenth St · Minor variance
To construct a two-storey rear addition including a deck in the rear yard.
220 m away · filed Aug 9, 2024 · Approved
47 Emerald Cres · Minor variance
To construct a two-storey east side addition including an attached garage. The altered dwelling will contain a secondary dwelling unit.
230 m away · filed May 31, 2024 · Hearing scheduled
72 Seventh St · Minor variance
To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.
70 m away · filed May 29, 2024 · Approved
62 Seventh St · Minor variance
To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.
50 m away · filed May 21, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.