Toronto address · Ward 3, Etobicoke-Lakeshore
53 Milton St
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposed second storey rear yard addition, interior alterations to existing second floor and new roof over existing front porch all to an existing detached single family dwelling.
Applied Nov 5, 2010 · issued Nov 22, 2010 · Permit 10 194618 HVA
- Revision issued
Small residential project · Multiple projects
REVISION 1 to increase second storey addition size by (8.68m2), change exterior finish from siding to stucco, add in (1) window on second floor and change front wood deck to concrete porch.Proposed second storey rear yard addition, interior alterations to existing second floor and new roof over existing front porch all to an existing detached single family dwelling.
Applied Oct 1, 2010 · issued Nov 9, 2010 · Permit 10 194618 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposed second storey rear yard addition, interior alterations to existing second floor and new roof over existing front porch all to an existing detached single family dwelling.
Applied Jun 17, 2010 · issued Jul 13, 2010 · Permit 10 194618 PLB
- Inspections under way
Small residential project · Multiple projects
Proposed second storey rear yard addition, interior alterations to existing second floor and new roof over existing front porch all to an existing detached single family dwelling.
Applied Jun 11, 2010 · issued Jul 13, 2010 · Permit 10 194618 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
4 storeys · Not stated in the file
260 m away · Rezoning · Under appeal · filed Dec 20, 2024
- Under review
29-71 Portland Street, 2-10 Audley Street and 8 Newcastle Street
27 storeys · 1,058 homes · Mixed use
300 m away · Site plan · Under review · filed Jul 5, 2024
- Under review
25 storeys · 479 homes · Mixed use
360 m away · Site plan · Under review · filed Nov 5, 2021
- Under review
54 storeys · 2,631 homes · Mixed use
360 m away · Rezoning · Under review · filed Jun 26, 2026
- Under review
37 storeys · 327 homes · Residential
390 m away · Condominium · Under review · filed Oct 21, 2021
Neighbours’ Committee of Adjustment files within 250 m
38 Grand Ave · Minor variance
To construct a two-storey rear addition and a deck in the rear yard.
180 m away · filed Jun 8, 2026 · Approved
56 Milton St · Minor variance
To construct a new detached dwelling.
60 m away · filed Mar 27, 2026 · Approved
181 Melrose St · Minor variance
To construct a two-storey west side addition and a second storey rear addition.
190 m away · filed Mar 13, 2026 · Approved
4 Milton St · Minor variance
To construct a two-storey rear addition.
220 m away · filed Oct 10, 2025 · Approved
25 Algoma St · Minor variance
To construct a rear one-storey addition. The altered dwelling will contain a secondary suite.
100 m away · filed Feb 26, 2025 · Approved
162 Melrose St · Minor variance
To construct a new detached dwelling with an attached garage.
180 m away · filed Oct 18, 2024 · Approved
162 Melrose St · Minor variance
To construct a new detached dwelling with an attached garage.
180 m away · filed Oct 18, 2024 · Approved
162 Melrose St · Consent
To obtain consent to sever the property into two undersized residential lots.
180 m away · filed Oct 18, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.