Toronto address · Ward 3, Etobicoke-Lakeshore
53 Renown Rd
The City of Toronto has 6 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
New house · New building
Revision # 01 - To change the rear deck, interior alterations and construct a 2nd storey addition over the garage.Proposal to construct new two-storey detached dwelling (240m2).
Applied Jan 6, 2017 · issued May 24, 2017 · Permit 16 242490 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal to construct new two-storey detached dwelling (240m2).
Applied Oct 25, 2016 · issued Dec 28, 2016 · Permit 16 242490 PLB
- Revocation pending
Drains and site services
Drain - Proposal to construct new two-storey detached dwelling (240m2).
Applied Oct 25, 2016 · issued Dec 28, 2016 · Permit 16 242490 DRN
- Inspections under way
New house · New building
Proposal to construct new two-storey detached dwelling (240m2).
Applied Oct 25, 2016 · issued Dec 28, 2016 · 1 home added · Permit 16 242490 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct new two-storey detached dwelling (240m2).
Applied Oct 25, 2016 · issued Dec 28, 2016 · completed Aug 26, 2025 · Permit 16 242490 HVA
- Closed
Demolition
Proposal to demolish existing one-storey single family dwelling (100m2).
Applied Oct 25, 2016 · issued Dec 28, 2016 · completed Jul 17, 2020 · 1 home removed · Permit 16 242516 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage.
Decision: Approved (hearing Apr 6, 2017)
Filed Feb 13, 2017 · File A0139/17EYK
What’s planned nearby
Development sites within 500 m
- Approved
5 storeys · 30 homes · Mixed use
110 m away · Site plan · Approved · filed Apr 28, 2021
- Under review
7 storeys · Residential
180 m away · Site plan · Under review · filed Dec 24, 2025
- Under review
- Under review
43 storeys · 198 homes · Residential
440 m away · Site plan · Under review · filed Jun 2, 2026
- Approved
44 storeys · 530 homes · Mixed use
470 m away · Site plan · Approved · filed Aug 19, 2025
- Approved
3825 Bloor Street West and 5230 Dundas Street West
36 storeys · 525 homes · Mixed use
480 m away · Site plan · Approved · filed Jul 4, 2024
Neighbours’ Committee of Adjustment files within 250 m
1006 Kipling Ave · Minor variance
To construct a new 6-storey apartment building that will contain a total of 46 residential units.
160 m away · filed Aug 7, 2025 · Approved
5134 Dundas St W · Minor variance
To construct a five-storey mixed-use building.
110 m away · filed Oct 29, 2024 · Approved
1012 Kipling Ave · Minor variance
170 m away · filed Jul 8, 2024 · Postponed
5 Streight Lane · Minor variance
To construct a deck in the rear yard.
200 m away · filed Jun 14, 2024 · Approved
17 Streight Lane · Minor variance
To construct a second storey rear platform.
180 m away · filed Jul 7, 2023 · Refused
5134 Dundas St W · Minor variance
To construct a new six-storey residential building and a six-storey mixed use building connected by a courtyard. A total of 28 dwelling units are proposed and two commercial units are proposed on the ground floor of the East Building.
110 m away · filed May 4, 2021 · Approved
27 Prennan Ave · Minor variance
To construct a new detached dwelling with an attached garage.
230 m away · filed Apr 30, 2021 · Approved
68 Royalavon Cres · Minor variance
To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0673/19EYK) approved variances relating to lot coverage, gross floor area, side yard setbacks, building length, building height and exterior stairs width.
240 m away · filed Sep 8, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.