Toronto address · Ward 3, Etobicoke-Lakeshore
54 Lynngrove Ave
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed front 2-story addition to existing single family dwelling.
Applied Aug 21, 2015 · issued Oct 22, 2015 · completed Nov 10, 2017 · Permit 15 210583 HVA
- Closed
Plumbing
Plumbing - Proposed front 2-story addition to existing single family dwelling.
Applied Aug 21, 2015 · issued Sep 3, 2015 · completed Nov 10, 2017 · Permit 15 210583 PLB
- Closed
Small residential project · Multiple projects
Remove load bearing wall to first floor. Partial new floor framing for for first and second floors. Extend roof over rear patio and extend rear first and second floors on a new cantillever.
Applied Aug 21, 2015 · issued Sep 3, 2015 · completed Jun 12, 2017 · Permit 15 210583 BLD
- Closed
Plumbing
Plumbing - Interior alterations re; To lower a portion of main floor to single family dwelling.
Applied Apr 2, 2015 · issued Apr 10, 2015 · completed Jun 12, 2017 · Permit 15 135712 PLB
- Closed
Small residential project · Interior alterations
Interior alterations re; To lower a portion of main floor to single family dwelling.
Applied Apr 2, 2015 · issued Apr 10, 2015 · completed Jun 12, 2017 · Permit 15 135712 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
4-8 Montgomery Road and 3100-3200 Bloor Street West
13 storeys · 319 homes · Mixed use
420 m away · Condominium · Under review · filed Oct 22, 2021
Neighbours’ Committee of Adjustment files within 250 m
27 Belvale Ave · Minor variance
To construct a two storey rear and north side addition, a one storey south side addition and a one storey front addition. The existing wood shed in the rear yard will be demolished. A previous Committee of Adjustment Decision (A280/15EYK) approved variances related to gross floor area, length and depth.
160 m away · filed Apr 10, 2026 · Approved
6 Princeton Rd · Minor variance
To construct a third storey addition above the existing dwelling, a three-storey north side and rear addition, a new rear yard deck, a new one-storey cabana and a new pool in the rear yard. The existing detached garage in the rear yard will be demolished.
220 m away · filed Feb 27, 2026 · Withdrawn
59 Westrose Ave · Minor variance
To construct a new detached dwelling with an attached garage.
250 m away · filed Feb 4, 2026 · Approved
49 Wilgar Rd · Minor variance
To construct a two-storey rear addition and a new rear deck.
220 m away · filed May 13, 2025 · Approved
42 Highgate Rd · Minor variance
To construct a rear two-storey addition to the existing dwelling, a second storey addition above the existing attached garage, a covered front porch, and a covered deck in the rear yard.
250 m away · filed Jan 10, 2025 · Approved
17 Highgate Rd · Minor variance
To construct a new detached dwelling with an attached garage.
120 m away · filed Sep 30, 2024 · Approved
1 Westrose Ave · Minor variance
To construct a second storey rear addition.
150 m away · filed Apr 19, 2024 · Approved
36 Westrose Ave · Minor variance
To construct a second and third storey addition above the existing dwelling. A previous Committee of Adjustment decision (A0554/17EYK) approved variances relating to lot coverage, floor space index, gross floor area, front and side yard setbacks, height, and platform area.
200 m away · filed Feb 1, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.