Toronto address · Ward 15, Don Valley West
54 Sutherland Dr
The City of Toronto has 6 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Drains and site services
Drain - To construct a new two-storey addition to the rear of the existing two-storey dwelling in conjunction with a one-storey addition to the west side of the dwelling.
Applied Sep 14, 2017 · issued Sep 14, 2017 · Permit 17 146248 DRN
- Inspections under way
Heating and ventilation
HVAC - To construct a new two-storey addition to the rear of the existing two-storey dwelling in conjunction with a one-storey addition to the west side of the dwelling.
Applied Apr 20, 2017 · issued Jun 6, 2017 · Permit 17 146248 HVA
- Inspections under way
Small residential project · Addition(s)
To construct a new two-storey addition to the rear of the existing two-storey dwelling in conjunction with a one-storey addition to the west side of the dwelling.
Applied Apr 20, 2017 · issued May 17, 2017 · Permit 17 146248 BLD
- Inspections under way
Plumbing
Plumbing - To construct a new two-storey addition to the rear of the existing two-storey dwelling in conjunction with a one-storey addition to the west side of the dwelling.
Applied Apr 20, 2017 · issued May 17, 2017 · Permit 17 146248 PLB
- Closed
Plumbing
Plumbing - Interior alteration to main floor of dwelling
Applied Feb 29, 2008 · issued Feb 29, 2008 · completed Jan 26, 2017 · Permit 08 115507 PLB
- Closed
Small residential project · Interior alterations
Interior alteration to main floor of dwelling
Applied Feb 29, 2008 · issued Feb 29, 2008 · completed Jan 26, 2017 · Permit 08 115507 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a new two-storey addition to the rear of the existing two-storey dwelling, in conjunction with a one-storey addition to the west side of the dwelling. The existing rear one-storey addition and detached garage would be demolished.
Decision: Approved (hearing Mar 23, 2017)
Filed Jan 23, 2017 · File A0045/17NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
10 Astor Ave · Minor variance
To construct a new dwelling.
240 m away · filed Oct 30, 2025 · Approved
24 Rolph Rd · Minor variance
To construct a new deck and a two storey rear addition to the existing house
170 m away · filed Apr 4, 2025 · Approved
95 Sutherland Dr · Minor variance
Proposal to construct a new dwelling.
230 m away · filed Apr 28, 2024 · Approved
45 Sutherland Dr · Minor variance
To construct a partial rear 2 storey addition, new covered side entry, and rear deck. Please note, the file was deferred on June 6, 2024, to allow the applicant to clarify varlances.
80 m away · filed Apr 22, 2024 · Approved
36 Bessborough Dr · Minor variance
Proposal for a two-storey side addition, a rear 2nd floor addition over existing one storey, existing bay window at the front to be rebuilt.
220 m away · filed Jan 26, 2024 · Approved
24 Sutherland Dr · Minor variance
To legalize and maintain the front yard soft landscaping area.
210 m away · filed Jun 6, 2023 · Approved
10 Southlea Ave · Minor variance
Proposal to add new cladding to front facade. Revise main roof to increase usable space on second floor.
250 m away · filed Jan 23, 2023 · Approved
65 Bessborough Dr · Minor variance
Proposal to construct a second storey rear addition, a two storey addition to the rear and south side of existing dwelling, and a rear yard pool.
110 m away · filed Sep 21, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.