Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

55 Wade Ave

The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Alternative solution

    OBC Sentence 3.1.15.2.(3) requires roofs on buildings designed to Article 3.2.2.50.A (six storey wood buildings) to have a Class A roof covering classification. The proposed eight storey building will have a green roof as required by City of Toronto Green Roof Bylaw.

    Applied Mar 16, 2018 · completed Apr 16, 2018 · Permit 18 130379 ALT

    Approved
  • Alternative solution

    The proposed eight storey office building will be provided with a standpipe system. In lieu of required fire hose stations, it is proposed to install 65 mm fire hose valve connections within the exit stairs in accordance with the NBC and NFPA 14. Fire hose valve connections will be located such that sufficient fire hose coverage of 33 m (30 m hose length + 3 m hose stream) is provided in all floor areas in the building.

    Applied Mar 16, 2018 · completed Apr 16, 2018 · Permit 18 130390 ALT

    Approved
  • Alternative solution

    It is proposed to construct the proposed eight storey office building of combustible construction, and to expose up to 79% of the ceiling finishes per floor area.Please refer to attached report from Vortex Fire Consulting Inc.: "VFT17191R01" for details.

    Applied Mar 16, 2018 · completed May 8, 2023 · Permit 18 130392 ALT

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    To install (1) Backflow Prevention Devices (Water only).

    Applied Sep 16, 2015 · issued Sep 17, 2015 · Permit 15 223737 PSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1281 Bloor St W · Consent

    To obtain consent for the technical severance of the property for the purpose of re-establishing two mixed-use lots which merged on title.

    240 m away · filed Mar 4, 2026 · Approved

  • 1319 Bloor St W · Consent

    To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.

    150 m away · filed Sep 3, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…

    150 m away · filed Apr 2, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.

    150 m away · filed Aug 16, 2024 · Approved

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    240 m away · filed Dec 12, 2023 · Approved

  • 83 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a complete third storey addition. Also, to construct a rear one-storey ancillary building (office space).

    170 m away · filed Nov 3, 2022 · Approved

  • 57 Wade Ave · Minor variance

    To permit the increase of overall building height, rooftop mechanical penthouse height, and changes to parking spaces, provided within the seven-storey office building, as approved by Site Specific Zoning By-law 1664-2019.

    50 m away · filed Jun 27, 2022 · Approved

  • 78 Campbell Ave · Minor variance

    .To alter the existing detached garage located in rear of the existing two-storey semi-detached dwelling by constructing a rooftop deck.

    210 m away · filed Feb 22, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.