Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 17, Don Valley North

550 Sheppard Ave E

Bayview Station

The City of Toronto has 8 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    Installation of backflow preventers providing premise isolation for the domestic water service at TTC's Bayview Subway Station.

    Applied Sep 7, 2023 · issued Oct 13, 2023 · completed Sep 24, 2025 · Permit 23 199358 PSA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - Bayview Subway Station

    Applied Dec 29, 2017 · issued Jan 30, 2018 · completed Oct 16, 2019 · Permit 17 280080 BLD

    Closed
  • Plumbing · Fixtures/Roof Drains: other

    Proposal for a stand alone plumbing permit to install a new hose bib and susequent piping in existing subway station - TTC Bayview Subway Station

    Applied Aug 21, 2014 · issued Sep 3, 2014 · Permit 14 209731 PSA

    Permit issued
  • Addition or alteration · Interior alterations

    Structural work in support of HVAC unit replacement in existing TTC Bayview subway station

    Applied Feb 12, 2014 · issued Feb 26, 2014 · Permit 14 116607 BLD

    Inspections under way
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Removal of existing HVAC units and replace existing TTC Bayview subway station

    Applied Feb 5, 2014 · issued Feb 19, 2014 · Permit 14 113523 MSA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposed intertior altertion to gateway newstand

    Applied Oct 8, 2002 · issued Nov 12, 2002 · completed Jun 8, 2026 · Permit 02 179898 BLD

    Closed (dormant)
  • Heating and ventilation

    Applied Aug 6, 1998 · issued Nov 25, 1998 · completed Jul 30, 2026 · Permit 98 251865 HVA

    Closed
  • Plumbing

    Applied Aug 6, 1998 · issued Dec 25, 1998 · completed Jun 8, 2026 · Permit 98 252053 PLB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 500 Sheppard Ave E · Minor variance

    To alter the development standards, as approved by Site-Specific Zoning By-law 605-2026(OLT), for the proposed multi-tower mixed use development by modifying the building heights, including increasing the height of Tower 2 to 45-storeys, modifying the building setbacks and separation distances of main walls, as well as reducing the indoor and outdoor amenity space requirements.

    110 m away · filed Jul 27, 2026 · Hearing scheduled

  • 461 Sheppard Ave E · Minor variance

    To alter the development standards, as approved under Site-Specific Zoning By-law 483-2024, for the proposed 44-storey mixed use building, including increase of the gross floor area and modifications to the encroachments, parking spaces and bicycle parking spaces.

    150 m away · filed Jun 19, 2026 · Approved

  • 2810 Bayview Ave · Minor variance

    To permit a reduction in the long-term and short- term bicycle parking requirements, related to the development of a new residential building on the subject site.

    240 m away · filed Feb 19, 2026 · Approved on condition

  • 2885 Bayview Ave · Minor variance

    To permit professional medical offices and a fitness centre.

    170 m away · filed Apr 23, 2019 · Approved

  • 2831 Bayview Ave · Minor variance

    To add 'Take-Out Restaurant' as a permitted use on the Subject Site.

    80 m away · filed Feb 19, 2019 · Approved

Everything planned in Don Valley North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.