Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

56 Lake Cres

The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for rear ground floor addition (39.78m²) and new rear deck to existing SFD.

    Applied Mar 27, 2026 · issued Apr 14, 2026 · Permit 25 245460 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for ground floor addition (39.78m²) and new rear deck to existing SFD.

    Applied Oct 27, 2025 · issued Nov 17, 2025 · Permit 25 245460 PLB

    Inspections under way
  • Small residential project · Addition(s)

    Proposal for rear ground floor addition (39.78m²) and new rear deck to existing SFD.

    Applied Oct 27, 2025 · issued Nov 17, 2025 · Permit 25 245460 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a one-storey rear addition, a rear yard deck and a concrete pad in the rear yard. The existing detached garage in the rear yard will be demolished.

    Decision: Approved (hearing Sep 25, 2025)

    Filed Aug 13, 2025 · File A0315/25EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 26 Central St · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Aug 24, 2026 · Hearing scheduled

  • 26 Elma St · Minor variance

    To construct a second storey addition above the existing dwelling, a new rear deck and a new front porch.

    250 m away · filed Mar 23, 2026 · Approved

  • 18 Murrie St · Minor variance

    To construct a two-storey rear addition to the existing dwelling.

    180 m away · filed Jul 30, 2025 · Approved

  • 106 Symons St · Minor variance

    To construct a new detached dwelling with an attached garage and a swimming pool in the rear yard.

    200 m away · filed Jul 5, 2023 · Approved

  • 106 Symons St · Consent

    To obtain consent to sever the property into two undersized lots.

    200 m away · filed Jul 5, 2023 · Approved

  • 106 Symons St · Minor variance

    To construct a new detached dwelling with an attached garage and a swimming pool in the rear yard.

    200 m away · filed Jul 5, 2023 · Approved

  • 121 Symons St · Minor variance

    To enlarge the existing basement to include an indoor pool and to construct a detached garage in the rear yard.

    220 m away · filed Jun 5, 2023 · Approved

  • 115 Symons St · Minor variance

    To remove the existing raised patio and collapsed retaining wall, and to construct a new concrete patio and barrier free ramp.

    190 m away · filed Jul 26, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.