Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

57 Ambleside Ave

The City of Toronto has 7 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision 1. See attached drawings

    Applied Sep 6, 2017 · issued Sep 8, 2017 · completed Mar 15, 2018 · Permit 16 260227 HVA (revision 01)

    Closed
  • New house · New building

    REV. #1- change to basement steel beamsProposal to construct a new single-family dwelling with attached garage.

    Applied Jan 6, 2017 · completed Jan 27, 2017 · Permit 16 260227 BLD (revision 01)

    Cancelled
  • New house · New building

    Proposal to construct a new single-family dwelling with attached garage.

    Applied Dec 5, 2016 · issued Dec 23, 2016 · 1 home added · Permit 16 260227 BLD

    Inspections under way
  • Demolition

    Proposal to demolish existing house and build new house.

    Applied Dec 5, 2016 · issued Dec 23, 2016 · completed Aug 2, 2018 · 1 home removed · Permit 16 260239 DEM

    Closed
  • Drains and site services

    Drain - Proposal to construct a new single-family dwelling with attached garage.

    Applied Dec 5, 2016 · issued Dec 23, 2016 · completed Feb 3, 2022 · Permit 16 260227 DRN

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new single-family dwelling with attached garage.

    Applied Dec 5, 2016 · issued Dec 23, 2016 · completed Feb 3, 2022 · Permit 16 260227 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new single-family dwelling with attached garage.

    Applied Dec 5, 2016 · issued Dec 23, 2016 · completed Mar 15, 2018 · Permit 16 260227 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 28 Ambleside Ave · Minor variance

    To construct a new detached dwelling with an attached garage, a front covered porch, a partially covered deck in the rear yard, and a third storey rear balcony

    230 m away · filed Mar 26, 2026 · Refused

  • 72 Edgecroft Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    150 m away · filed Dec 17, 2025 · Approved

  • 44 Ambleside Ave · Minor variance

    To construct a new detached dwelling with a secondary suite and an attached garage

    90 m away · filed Sep 30, 2025 · Approved

  • 70 Edgecroft Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    150 m away · filed Jun 19, 2025 · Approved

  • 65 Edgecroft Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    190 m away · filed Feb 22, 2023 · Approved

  • 59 Edgecroft Rd · Minor variance

    To construct a new rear yard deck. A previous Committee of Adjustment application (A0323/20EYK) approved variances relating to floor space index, dwelling length, soffit height and driveway width.

    200 m away · filed Aug 24, 2022 · Approved

  • 45 Edgecroft Rd · Minor variance

    To constuct a new detached dwelling with an integral garage

    250 m away · filed Aug 12, 2022 · Approved

  • 80 Edgecroft Rd · Minor variance

    To construct a two-storey rear addition, a two-storey east side addition and a second storey addition above the existing dwelling.

    160 m away · filed Apr 14, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.