Toronto address · Ward 9, Davenport
57 Rosethorn Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Other
Rooftop solar panel installation
Applied Oct 19, 2023 · issued Oct 25, 2023 · completed Jun 12, 2024 · Permit 23 216427 BLD
- Closed
Small residential project · Garage
build semi-detached private garage at rear. see party wall letter in file and arborists rept Card Printed
Applied Jul 12, 2002 · issued Jul 25, 2002 · completed Apr 19, 2023 · Permit 02 153292 BLD
- Closed
Small residential project · Porch
Re-construct portion of porch at front
Applied May 29, 2001 · issued May 29, 2001 · completed Apr 19, 2023 · Permit 01 141750 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
119-200 Benny Stark Street and 116 Turnberry Avenue
24 storeys · 547 homes · Mixed use
420 m away · Site plan · Under review · filed Apr 29, 2022
- Under review
- Under review
- Under review
39 storeys · 1,951 homes · Mixed use
470 m away · Site plan · Under review · filed Apr 25, 2022
Neighbours’ Committee of Adjustment files within 250 m
88 Howick Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level), a rear first floor deck with stairs, and a rear second floor rooftop deck.
230 m away · filed Aug 10, 2026 · Hearing scheduled
113 Silverthorn Ave · Minor variance
To alter the existing one-storey ancillary building (detached one-car garage) by constructing a rooftop deck (above the existing garage), and rooftop access stairs at the west side of the building.
190 m away · filed Jul 15, 2025 · Refused
43 Turnberry Ave · Minor variance
To legalize and to maintain the reconstruction of a complete second storey addition, and the construction of a rear two-storey addition (including a basement extension below), and front and rear covered porches with stairs, which were all constructed beyond an authorized building permit.
110 m away · filed Feb 21, 2025 · Approved
249 Silverthorn Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, new front and rear covered verandahs with stairs, front and rear basement walkouts, and front and rear second storey balconies. Also, to construct a new two-storey detached ancillary building (containing one garden suite which will occupy both levels), in the rear yard of the property. There will be a total of four residential dwelling units on this lot (three dwelling units within the main house and one dwelling unit within the ancillary building).
170 m away · filed Jul 10, 2024 · Approved
581 Old Weston Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition over the existing rear basement walkout. There will be one primary unit and one secondary suite within this dwelling.
170 m away · filed Sep 1, 2023 · Approved
35 Turnberry Ave · Minor variance
To construct a new rear detached garage.
80 m away · filed Aug 31, 2021 · Approved
633 Old Weston Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing: a rear two-storey addition; a rear walk-out basement; and rear decks on the ground floor and second storey. Also, to convert the existing attached garage into storage area.
230 m away · filed Aug 6, 2021 · Approved
134 Rockwell Ave · Minor variance
To construct a new three-storey detached dwelling on the conveyed lot known as Part 2, created through consent application B0038/21TEY. The new dwelling will have a front second and third storey balcony, rear ground floor deck and front integral garage.
210 m away · filed Apr 3, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.