575 Avenue Rd

The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Garage Repair/Reconstruction

    Proposed localized wall leak repairs in parking garage

    Applied Nov 17, 2023 · issued Dec 12, 2023 · Permit 23 227222 BLD

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposed facade renewal on the west elevation, balcony repairs, and replacement of balcony railings

    Applied May 12, 2020 · issued Jul 8, 2020 · Permit 20 144565 BLD

    Inspections under way
  • Fire and security upgrade · Sprinklers

    Proposal to install a new sprinkler system in the lobby area.

    Applied Mar 27, 2019 · issued Apr 2, 2019 · completed Jun 2, 2020 · Permit 19 131703 FSU

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a 2 inch backflow prevention device.

    Applied Jun 7, 2016 · issued Jul 19, 2016 · Permit 16 169757 PSA

    Inspections under way
  • Addition or alteration · Other

    Proposal to install 19 new roof anchors for suspended access. Existing Apartment Building

    Applied Feb 15, 2007 · issued Feb 27, 2007 · completed Jun 9, 2025 · Permit 07 109479 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 111 Heath St W · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey addition along the east side and rear south walls of the dwelling and a side (west) basement walkout.

    110 m away · filed Jan 8, 2024 · Approved

  • 29 Forest Hill Rd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey side addition, a garage expansion and a below grade addition that will connect the existing dwelling to the detached garage.

    160 m away · filed Feb 24, 2022 · Approved

  • 108 Heath St W · Consent

    To obtain consent to sever the property into two undersized residential lots.

    160 m away · filed Jan 28, 2022 · Approved

  • 108 Heath St W · Minor variance

    To construct a new three-storey semi-detached dwelling with an integral garage, a front porch, a rear ground level deck, and a rear basement walkout.

    160 m away · filed Jan 28, 2022 · Approved

  • 108 Heath St W · Minor variance

    To construct a new three-storey semi-detached dwelling with an integral garage, a front porch, a rear ground level deck, and a rear basement walkout.

    160 m away · filed Jan 28, 2022 · Approved

  • 70 Oriole Rd · Minor variance

    To alter the existing 2½-storey detached dwelling by constructing a rear second storey deck and to construct a new one-storey ancillary building in the rear yard.

    140 m away · filed Jun 1, 2021 · Application withdrawn

  • 101 Heath St W · Minor variance

    To construct a three-storey apartment building with an underground parking garage, a front yard transformer, front first storey platforms, a front third storey balcony, east and west side second and third storey balconies, and a rooftop mechanical equipment enclosure.

    180 m away · filed Mar 2, 2021 · Approved

  • 61 Oriole Rd · Minor variance

    To construct a two-storey detached dwelling with a front driveway, an integral garage, and a rear deck.

    140 m away · filed Apr 20, 2020 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.