Toronto address · Ward 24, Scarborough-Guildwood
58 Copping Rd
The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Rev 03: Revisions to foundation and to reduce size f carport and enlarge size if front entry To construct a 2nd storey addition, one storey addition at the side, interior alterations, and attached garage
Applied Aug 31, 2016 · issued Sep 21, 2016 · Permit 09 187316 BLD (revision 03)
- Revision issued
Small residential project · Multiple projects
REV. #2-reduce the scope of work- second storey not to be built at this time, enlarging carport, and one storey side addition by 2.2 sq. mTo construct a 2nd storey addition, one storey addition at the side, interior alterations, and attached garage
Applied Jun 26, 2015 · issued Feb 5, 2016 · Permit 09 187316 BLD (revision 02)
- Revision issued
Small residential project · Multiple projects
Revision to change part of a storage room into a washroom in the basementTo construct a 2nd storey addition, one storey addition at the side, interior alterations, and attached garage
Applied Aug 8, 2011 · issued Aug 24, 2011 · Permit 09 187316 BLD (revision 01)
- Inspections under way
Drains and site services
Drain - To construct a 2nd storey addition, one storey addition at the side, interior alterations, and attached garage
Applied Aug 8, 2011 · issued Aug 8, 2011 · Permit 09 187316 DRN
- Inspections under way
Small residential project · Multiple projects
To construct a 2nd storey addition, one storey addition at the side, interior alterations, and attached garage
Applied Nov 12, 2009 · issued May 13, 2010 · Permit 09 187316 BLD
- Closed
Heating and ventilation
HVAC - To construct a 2nd storey addition, one storey addition at the side, interior alterations, and attached garage.
Applied Nov 12, 2009 · issued Jun 21, 2010 · completed Feb 6, 2018 · Permit 09 187316 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
59 Copping Rd · Minor variance
To construct a second-storey addition to the existing two-storey detached dwelling.
70 m away · filed Mar 6, 2024 · Approved
59 Copping Rd · Minor variance
To construct a new basement and ground floor rear addition, a second storey sunroom, a covered deck, and a new two-car garage in the rear.
70 m away · filed Feb 25, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.