Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

58 Eighth St

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision # 01 - To the HVAC layout in the existing single family dwelling.HVAC - Proposed demolition of existing dwelling to be replaced by new 2.5 storey single family dwelling with finished basement and integrated garage.

    Applied Feb 26, 2019 · issued Mar 22, 2019 · completed Sep 23, 2020 · Permit 18 168077 HVA (revision 01)

    Closed
  • New house · New building

    Revision #1 - temporary shoring in response to inspectors order - 18 204123 OTC

    Applied Aug 14, 2018 · issued Aug 29, 2018 · completed Oct 1, 2020 · Permit 18 168077 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposed demolition of existing dwelling to be replaced by new 2.5 storey single family dwelling with finished basement and integrated garage.

    Applied May 30, 2018 · issued Jun 13, 2018 · completed Sep 23, 2020 · Permit 18 168077 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposed demolition of existing dwelling to be replaced by new 2.5 storey single family dwelling with finished basement and integrated garage.

    Applied May 30, 2018 · issued Jun 22, 2018 · completed Sep 23, 2020 · Permit 18 168077 HVA

    Closed
  • New house · New building

    Proposed demolition of existing dwelling to be replaced by new 2.5 storey single family dwelling with finished basement and integrated garage.

    Applied May 30, 2018 · issued Jun 13, 2018 · completed Oct 1, 2020 · 1 home added · Permit 18 168077 BLD

    Closed
  • Demolition

    Proposed demolition of existing dwelling to be replaced by new 2.5 storey single family dwelling with finished basement and integrated garage.

    Applied May 30, 2018 · issued Jun 13, 2018 · completed Apr 5, 2019 · 1 home removed · Permit 18 168155 DEM

    Closed
  • Drains and site services

    Drain - Proposed demolition of existing dwelling to be replaced by new 2.5 storey single family dwelling with finished basement and integrated garage.

    Applied May 30, 2018 · issued Jun 13, 2018 · completed Sep 23, 2020 · Permit 18 168077 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 73 Tenth St · Minor variance

    To construct a one-storey rear addition and a new rear deck.

    180 m away · filed Dec 2, 2025 · Approved

  • 46 Tenth St · Minor variance

    To maintain the existing front porch that is currently uncer construction.

    190 m away · filed Sep 26, 2025 · Approved

  • 84 Tenth St · Minor variance

    To construct a second and third storey addition above the existing dwelling.

    240 m away · filed Apr 29, 2025 · Approved

  • 16 Eighth St · Minor variance

    To enclose the existing front porch.

    160 m away · filed Apr 24, 2025 · Approved

  • 62 Seventh St · Minor variance

    To construct a new duplex with an attached garage.

    100 m away · filed Apr 11, 2025 · Refused

  • 69 Tenth St · Minor variance

    To construct a two-storey rear addition including a deck in the rear yard.

    180 m away · filed Aug 9, 2024 · Approved

  • 72 Seventh St · Minor variance

    To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.

    100 m away · filed May 29, 2024 · Approved

  • 62 Seventh St · Minor variance

    To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.

    100 m away · filed May 21, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.