Toronto address · Ward 3, Etobicoke-Lakeshore
58 Fifth St
The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - full basement underpinning and related sanitary, storm and water piping.
Applied Feb 15, 2013 · issued Feb 15, 2013 · Permit 13 113917 PLB
- Cancelled
Plumbing
Plumbing - Interior alterations to basement floor to single family dwelling. Also add related plubming fixtures, Sump Pump and (inside) Backwater Valve.
Applied Feb 15, 2013 · issued Feb 19, 2013 · completed Feb 19, 2026 · Permit 13 120762 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · Not stated in the file
360 m away · Site plan · Under review · filed Mar 13, 2026
Neighbours’ Committee of Adjustment files within 250 m
62 Seventh St · Minor variance
To construct a new duplex with an attached garage.
190 m away · filed Apr 11, 2025 · Refused
53 Lake Shore Dr · Minor variance
To construct a second storey addition above the existing dwelling, to reconfigure the existing basment walkout and a new covered deck along the south side.
200 m away · filed Oct 4, 2024 · Approved
72 Seventh St · Minor variance
To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.
200 m away · filed May 29, 2024 · Approved
62 Seventh St · Minor variance
To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.
190 m away · filed May 21, 2024 · Approved
118 Fifth St · Minor variance
To legalize and to maintain the garden suite that is currently under construction.
250 m away · filed Dec 4, 2023 · Refused
45 Fourth St · Minor variance
To construct a two-storey front addition and a new front porch.
150 m away · filed Aug 21, 2023 · Approved
62 Seventh St · Minor variance
To construct a two-storey rear and south side addiiton.
190 m away · filed Mar 15, 2023 · Approved
38 Fourth St · Minor variance
To construct a two-storey south side addition and to maintain the existing driveway.
100 m away · filed Dec 15, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.