Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

583 Gladstone Ave

The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for interior alterations and bench footing

    Applied Jun 25, 2020 · issued Jul 3, 2020 · Permit 20 160194 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for interior alterations and bench footing

    Applied Jun 25, 2020 · issued Jul 3, 2020 · completed Dec 6, 2021 · Permit 20 160194 BLD

    Closed
  • Drains and site services

    Drain - Proposal for interior alterations and bench footing

    Applied Jun 25, 2020 · issued Jul 3, 2020 · completed Sep 7, 2021 · Permit 20 160194 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1045 Dufferin St · Minor variance

    To construct a new three-storey building (utility (switchgear) facility). There will be two front yard parking spaces. A Site Plan Control application (File Number 25 166590 STE 09 SA) is currently under review.

    120 m away · filed Feb 13, 2026 · Approved

  • 91 Salem Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new front one-storey addition with stairs, a front basement walkout, and a rear one-storey addition with a wood landing. The existing rear ground floor deck will be maintained and unaltered.

    240 m away · filed Oct 23, 2025 · Approved

  • 1081 Dufferin St · Minor variance

    To construct a new one-storey detached ancillary building (two-car garage), in the rear yard of the existing two-storey detached dwelling.

    110 m away · filed May 20, 2025 · Approved

  • 57 Bartlett Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear second storey addition (cantilevered at the rear portion).

    110 m away · filed Mar 19, 2025 · Approved

  • 79 Bartlett Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear walkway. Also, to alter the existing one-storey ancillary building (rear detached garage, abutting the laneway) by constructing a complete second storey addition for one laneway suite. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the ancillary building).

    140 m away · filed Oct 24, 2024 · Approved

  • 1064 Dufferin St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling (duplex) by converting the existing rear one-storey ancillary building (detached garage) into one garden suite. There will be a total of three residential dwelling units on this lot (two units within the dwelling and one unit within the ancillary building).

    140 m away · filed Jul 19, 2024 · Approved

  • 1119 Dufferin St · Minor variance

    To construct a new three-storey detached dwelling (triplex) with rear decks on the ground, second, and third levels, a front third storey rooftop terrace above the front cantilevered second storey portion of the dwelling, and a front landing with stairs.

    220 m away · filed Mar 4, 2024 · Approved

  • 99 Bartlett Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing the front stairs, and enclosing the front porch.

    180 m away · filed Feb 13, 2024 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.