Toronto address · Ward 14, Toronto-Danforth
59 Boston Ave
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a new 1 storey laneway suite at the rear of an existing SFD-semi dwelling.See also 21 103931 ZZC.
Applied Dec 7, 2021 · issued Dec 20, 2021 · Permit 21 176794 HVA
- Inspections under way
Small residential project · New laneway / rear yard suite
Proposal to construct a new 1 storey laneway suite at the rear of an existing SFD-semi dwelling.See also 21 103931 ZZC.
Applied Jun 28, 2021 · issued Sep 15, 2021 · 1 home added · Permit 21 176794 BLD
- Inspections under way
Drains and site services
Drain - Proposal to construct a new 1storey laneway suite at the rear of an existing SFD-semi dwelling.See also 21 103931 ZZC.
Applied Jun 28, 2021 · issued Sep 15, 2021 · Permit 21 176794 DRN
- Inspections under way
Plumbing
Plumbing - Proposal to construct a new 1storey laneway suite at the rear of an existing SFD-semi dwelling.See also 21 103931 ZZC.
Applied Jun 28, 2021 · issued Sep 15, 2021 · Permit 21 176794 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
310 m away · Site plan · Approved · filed May 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
64 Brooklyn Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).
210 m away · filed Apr 23, 2026 · Approved
188 Pape Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.
100 m away · filed Mar 2, 2026 · Approved
137 Boston Ave · Minor variance
To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.
200 m away · filed Jul 17, 2025 · Approved
188 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.
100 m away · filed Jun 5, 2025 · Approved
14 Blong Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
150 m away · filed Apr 22, 2025 · Approved
326 Carlaw Ave · Minor variance
To alter the existing four-storey mixed-use building by constructing a one-storey rooftop addition (including a deck) above the residential condominium unit (Unit 109), as well as to construct a mezzanine addition within Unit 109.
210 m away · filed Apr 3, 2025 · Approved
53 Boston Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (with basement extension below), a rear ground floor deck with stairs (the existing rear deck and stairs will be demolished), and a rear basement walkout.
20 m away · filed Dec 3, 2024 · Approved
43 Boston Ave · Minor variance
To alter the existing two-storey rowhouse dwelling by constructing a new front basement walkout with stairs for the purposes of accommodating a secondary suite. Also, to reconstruct the rear ground level deck. There will be two dwellings on the lot (duplex).
50 m away · filed Sep 5, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.