The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision 01 - HVAC System.HVAC - Proposal to construct a new 2 storey SFD-detache dwelling with a finished basement. See also 17 129680 DEM, 16 229982 ZZC, 16 248728 MV and Final and Binding A0971/16NY

    Applied Jul 17, 2017 · issued Oct 5, 2017 · completed Mar 25, 2019 · Permit 17 129684 HVA (revision 01)

    Closed
  • New house · New building

    Revision 01: Proposal for a walkout in the rear.Proposal to construct a new 2 storey SFD-detache dwelling with a finished basement. See also 17 129680 DEM, 16 229982 ZZC, 16 248728 MV and Final and Binding A0971/16NY

    Applied May 11, 2017 · issued Jun 8, 2017 · completed Aug 1, 2019 · Permit 17 129684 BLD (revision 01)

    Closed
  • Drains and site services

    Drain - Proposal to construct a new 2 storey SFD-detache dwelling with a finished basement. See also 17 129680 DEM, 16 229982 ZZC, 16 248728 MV and Final and Binding A0971/16NY

    Applied Mar 23, 2017 · issued Apr 21, 2017 · completed Mar 25, 2019 · Permit 17 129684 DRN

    Closed
  • Demolition

    Proposal to demolish the existing 2 storey SFD-detached dwelling.

    Applied Mar 16, 2017 · issued Apr 21, 2017 · completed Jul 27, 2017 · 1 home removed · Permit 17 129680 DEM

    Closed
  • New house · New building

    Proposal to construct a new 2 storey SFD-detache dwelling with a finished basement. See also 17 129680 DEM, 16 229982 ZZC, 16 248728 MV and Final and Binding A0971/16NY

    Applied Mar 16, 2017 · issued Apr 21, 2017 · completed Aug 1, 2019 · 1 home added · Permit 17 129684 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey SFD-detache dwelling with a finished basement. See also 17 129680 DEM, 16 229982 ZZC, 16 248728 MV and Final and Binding A0971/16NY

    Applied Mar 16, 2017 · issued Apr 28, 2017 · completed Mar 25, 2019 · Permit 17 129684 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey SFD-detache dwelling with a finished basement. See also 17 129680 DEM, 16 229982 ZZC, 16 248728 MV and Final and Binding A0971/16NY

    Applied Mar 16, 2017 · issued Apr 21, 2017 · completed Mar 25, 2019 · Permit 17 129684 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey dwelling. The existing dwelling would be demolished.

    Decision: Approved (hearing Jan 12, 2017)

    Filed Nov 8, 2016 · File A0971/16NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 29 Kappele Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a new two-storey rear addition. The existing one-storey rear addition and deck would be demolished.

    200 m away · filed Jun 30, 2025 · Approved

  • 41 Braeside Rd · Minor variance

    To construct a two-storey addition to the front and two-storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.

    60 m away · filed Feb 10, 2025 · Approved

  • 26 Braeside Rd · Minor variance

    To construct a new detached 2 storey dwelling and demolish existing garage in the rear yard.

    150 m away · filed Mar 18, 2024 · Approved

  • 1 Braeside Cres · Minor variance

    To construct a new dwelling. Please note, this application was previously deferred, Thursday, December 7, 2023.

    200 m away · filed Oct 19, 2023 · Refused

  • 42 Kappele Ave · Minor variance

    Proposal to construct a new single family detached dwelling. (Deferred from the hearing of 8 June 2023)

    230 m away · filed Mar 29, 2023 · Approved

  • 31 Kappele Ave · Minor variance

    Proposal to construct a two-storey rear addition to existing dwelling.

    200 m away · filed Jul 6, 2022 · Approved

  • 17 Langton Ave · Minor variance

    To construct a new dwelling.

    50 m away · filed Jul 18, 2021 · Approved

  • 12 Braeside Cres · Minor variance

    To construct a new dwelling.

    200 m away · filed Jun 5, 2020 · Approved

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.