Toronto address · Ward 14, Toronto-Danforth
59 Dingwall Ave
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Deck
Remove existing rear framed deck and construct new c/w steps to grade
Applied Jul 5, 2023 · issued Jul 11, 2023 · completed Sep 6, 2023 · Permit 23 169908 BLD
- Cancelled
Small residential project · Deck
Remove existing rear framed deck and contruct new c/wsteps to grade
Applied May 1, 2023 · completed Jun 15, 2023 · Permit 23 139884 BLD
- Closed
Small residential project · Addition(s)
Rev 01 : Revision to 21 247940 BLD 00 SR for foundation workProposal to construct a rear 2nd floor addition to an existing 2 storey SFD-semi dwelling.See also 21 232384 ZZC.
Applied Jun 3, 2022 · issued Jun 8, 2022 · completed Oct 5, 2022 · Permit 21 247940 BLD (revision 01)
- Closed
Small residential project · Addition(s)
Proposal to construct a rear 2nd floor addition to an existing 2 storey SFD-semi dwelling.See also 21 232384 ZZC.
Applied Dec 13, 2021 · issued May 2, 2022 · completed Oct 5, 2022 · Permit 21 247940 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install back water valve.
Applied Jul 3, 2020 · issued Jul 6, 2020 · completed Jul 7, 2020 · Permit 20 163117 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
59 Blake St · Minor variance
230 m away · filed Aug 28, 2026 · Postponed
260 Bain Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a third storey side (west) roof deck. The rear ground floor one-storey addition has been demolished and a new rear ground floor deck with stairs and as well as a rear basement walkout has already been constructed under approved Building Permit No. 24 172386 BLD 02 SR.
200 m away · filed May 23, 2025 · Approved
255 Bain Ave · Minor variance
To construct a new three-storey detached dwelling with a front porch, a third storey terrace (above the second floor at the southwest portion of the dwelling), and a rear ground floor deck. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
240 m away · filed Dec 27, 2024 · Approved
68 Wroxeter Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition.
210 m away · filed Sep 12, 2024 · Approved
80 Wroxeter Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, and a front third storey dormer.
210 m away · filed Sep 20, 2023 · Approved
287 Withrow Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial front second storey addition, partial front and rear third storey additions (with front second and third storey juliette balconies), and a rear third storey balcony.
180 m away · filed Aug 16, 2023 · Approved
76 Dingwall Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial rear third storey addition.
70 m away · filed Mar 28, 2023 · Approved
515 Pape Ave · Minor variance
To alter the existing one-storey ancillary building by constructing a complete second storey with a roof terrace. This building will be converted into a garden suite.
100 m away · filed Jan 17, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.