Toronto address · Ward 19, Beaches-East York
59 Edgewood Ave
The City of Toronto has 9 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Issuance pending
Heating and ventilation
HVAC - Proposed accessibility interior renovation of existing 4 storey TCHC apartment building. Scope of work includes wider doors to common rooms, upgrades to public washrooms to make them more accessible, upgrate to HVA system at community center to add cooling, and other minor accessibility upgrades.
Applied Aug 28, 2026 · Permit 26 226465 HVA
- Issuance pending
Plumbing
Plumbing - Proposed accessibility interior renovation of existing 4 storey TCHC apartment building. Scope of work includes wider doors to common rooms, upgrades to public washrooms to make them more accessible, upgrate to HVA system at community center to add cooling, and other minor accessibility upgrades.
Applied Aug 28, 2026 · Permit 26 226465 PLB
- Under review
Addition or alteration · Other
Proposal for exterior alterations of the site features of an existing four storey TCHC apartment building (replace paved walkway with concrete walkway, additional rest areas, additional accessible picnic table area and standalone canopy installation).
Applied Aug 26, 2026 · Permit 26 226437 BLD
- Under review
Addition or alteration · Interior alterations
Proposal for interior alterations to existing four storey TCHC apartment building (doorway widening, alterations to washroom, mechanical upgrades and other minor accessible upgrades).
Applied Aug 26, 2026 · Permit 26 226465 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations of non-conforming residential building to revise administration offices
Applied Jun 5, 2020 · issued Jul 7, 2020 · Permit 20 152775 HVA
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations of non-conforming residential building to revise administration offices
Applied Jun 5, 2020 · issued Jul 7, 2020 · Permit 20 152775 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations of non-conforming residential building to revise administration offices
Applied Jun 5, 2020 · issued Jul 7, 2020 · Permit 20 152775 BLD
- Closed
Fire and security upgrade · Fire alarm
Proposal to replace the fire alarm control panel in the existing apartment building.
Applied Apr 27, 2020 · issued May 27, 2020 · completed Jun 29, 2021 · Permit 20 139500 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 1 maglock on first floor.
Applied May 29, 2018 · issued Jun 20, 2018 · completed Aug 8, 2018 · Permit 18 167065 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
10 storeys · 168 homes · Mixed use
470 m away · Rezoning · Approved · filed Apr 28, 2025
- Under review
6 storeys · 91 homes · Mixed use
470 m away · Site plan · Under review · filed Nov 7, 2021
- Under review
11 storeys · 123 homes · Mixed use
490 m away · Rezoning · Under review · filed Mar 18, 2025
Neighbours’ Committee of Adjustment files within 250 m
5 Edgewood Gdns · Minor variance
To legalize and to maintain one additional ground floor deck, two ancillary buildings (sheds containing storage, utility, and garden equipment), and hard surface driveway and patio areas, which have been constructed without an authorized building permit. Also, to permit the existing two-storey detached ancillary building (containing one garden suite). There is a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building.
230 m away · filed Nov 13, 2025 · Approved
8 Edgewood Grv · Minor variance
To construct a new two-storey detached dwelling (including a basement) with a front ground level covered deck (abutting Edgewood Grove), and a side (east) covered porch with stairs (abutting Edgewood Gardens). Also, to construct a new one-storey detached ancillary building (one-car garage), abutting Edgewood Gardens.
200 m away · filed Nov 4, 2025 · Approved
66 Edgewood Ave · Minor variance
To construct a new two-storey garden suite with a front basement walkout, a front ground floor entrance with external stairs, and north and south side second storey green roofs, in the rear yard of the lot. The existing two-storey detached main dwelling on the lot will remain unaltered.
110 m away · filed Jan 20, 2024 · Approved
55 Maughan Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition, a rear uncovered deck, a new front porch and stairs, and an air conditioner on the rear wall. Also, to construct an ancillary building (shed) in the side (north) yard.
230 m away · filed Mar 10, 2023 · Approved
1 Edgewood Gdns · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition, a two-storey front addition, and a front second storey cantilevered window box.
210 m away · filed Nov 4, 2022 · Approved
81 Robbins Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a one-storey addition along the side (east) and rear (south) walls, and a rear ground level deck.
210 m away · filed Oct 3, 2022 · Approved
21 Hemlock Ave · Minor variance
To maintain the side deck and stairs that were constructed beyond the limits of a building permit.
210 m away · filed Nov 17, 2021 · Approved
73 Robbins Ave · Minor variance
To legalize and to maintain the ancillary building (shed) and covered deck that were constructed in the rear yard of the property without the benefit of a building permit.
240 m away · filed Oct 26, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.