Toronto address · Ward 15, Don Valley West
59 Fifeshire Rd
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
REV #-1 REVISE LAYOUTHVAC - Proposal to construct a side second storey addition with garage and a rear two storey addition with a deck and walkout.
Applied Mar 30, 2021 · issued Apr 15, 2021 · completed Feb 27, 2023 · Permit 20 149282 HVA (revision 01)
- Closed
Small residential project · Multiple projects
Revision 01: bedroom addition over the garage + interior alterations
Applied Mar 15, 2021 · issued Mar 30, 2021 · completed May 3, 2023 · Permit 20 149282 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct a side second storey addition with garage and a rear two storey addition with a deck and walkout.
Applied May 27, 2020 · issued Jul 14, 2020 · completed Feb 27, 2023 · Permit 20 149282 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a side second storey addition with garage and a rear two storey addition with a deck and walkout.
Applied May 27, 2020 · issued Jul 14, 2020 · completed May 3, 2023 · Permit 20 149282 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a side second storey addition with garage and a rear two storey addition with a deck and walkout.
Applied May 27, 2020 · issued Jul 14, 2020 · completed May 3, 2023 · Permit 20 149282 BLD
- Closed
Drains and site services
Drain - Proposal to construct a side second storey addition with garage and a rear two storey addition with a deck and walkout.
Applied May 27, 2020 · issued Jul 14, 2020 · completed Feb 27, 2023 · Permit 20 149282 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey addition to the rear of the existing dwelling, in conjunction with a second storey addition and a one-storey addition to the east portion of the dwelling. The applicant is also proposing other interior and exterior alterations.
Decision: Approved (hearing Sep 26, 2019)
Filed Aug 26, 2019 · File A0579/19NY
What’s planned nearby
Development sites within 500 m
- Under review
7 storeys · 168 homes · Residential
180 m away · Rezoning · Under review · filed Apr 29, 2025
- Approved
Neighbours’ Committee of Adjustment files within 250 m
36 Chieftain Cres · Minor variance
To construct a two-storey detached duplex.
30 m away · filed Jun 3, 2026 · Approved
44 Fifeshire Rd · Minor variance
To construct a first floor west side garage addition and second floor west side addition.
240 m away · filed May 1, 2026 · Approved
48 Fifeshire Rd · Minor variance
To construct a new dwelling.
190 m away · filed Dec 14, 2021 · Approved
3 Chieftain Cres · Minor variance
To legalize and maintain the rear ancillary building.
250 m away · filed Aug 4, 2020 · Approved
17 Chieftain Cres · Minor variance
To construct a new dwelling.
170 m away · filed Nov 6, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.