Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

6 Athlone Dr

The City of Toronto has 4 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed demolition of the existing dwelling and construction of a new 2-storey single family detached dwelling.

    Applied Nov 12, 2019 · issued Dec 5, 2019 · Permit 19 248042 PLB

    Inspections under way
  • New house · New building

    Proposed demolition of the existing dwelling and construction of a new 2-storey single family detached dwelling.

    Applied Nov 12, 2019 · issued Dec 5, 2019 · 1 home added · Permit 19 248042 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed demolition of the existing dwelling and construction of a new 2-storey single family detached dwelling.

    Applied Nov 12, 2019 · issued Dec 5, 2019 · Permit 19 248042 HVA

    Inspections under way
  • Demolition

    Proposed demolition of the existing dwelling.

    Applied Nov 12, 2019 · issued Dec 5, 2019 · completed May 6, 2021 · 1 home removed · Permit 19 248019 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new detached dwelling with an attached garage.

    Decision: Approved (hearing Jul 18, 2019)

    Filed Jun 13, 2019 · File A0323/19EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Ashton Manor · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Feb 23, 2026 · Approved

  • 21 Glenroy Ave · Minor variance

    To construct a new two-storey front addition, a two-storey read addition and a second storey addition above the existing dwelling. This will be considered a new dwelling.

    170 m away · filed Oct 30, 2025 · Approved

  • 22 Ashton Manor · Minor variance

    To construct a new deck in the rear yard.

    210 m away · filed May 15, 2025 · Approved

  • 21 Ashton Manor · Minor variance

    To construct a second storey addition over the existing front porch, a two-storey rear addition, and a new detached garage in the rear yard.

    160 m away · filed Dec 11, 2023 · Approved

  • 19 Athlone Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    110 m away · filed Nov 27, 2023 · Approved

  • 6 Glenaden Ave W · Minor variance

    To construct a new detached dwelling with an attached garage.

    170 m away · filed Apr 6, 2023 · Approved

  • 29 Edgemore Dr · Minor variance

    To construct a two-storey rear addition and a second storey addition above the existing dwelling.

    230 m away · filed Jan 9, 2023 · Approved

  • 50 Edgemore Dr · Minor variance

    To construct a two-storey rear addition.

    100 m away · filed Dec 19, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.