Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 15, Don Valley West

6 Park Lane Crcl

The City of Toronto has 7 building permits since 2017 (6 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    This application is for a revision to an official building Permit handed out on Feb, 15, 2024. Permit No.23 196397 BLD 00 NH. The changes relate to the removal of the firewall from the lower level garage,the addition of a fire alarm system, and an adjustment to the driveway access from the street. Severalstructural related changes have also been made to beams and trusses that are now being supported bythe internal concrete wall (previously designed firewall). Classification has changed to OBC 3.2.2.46.Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a fin…

    Applied Jul 2, 2024 · issued Nov 15, 2024 · Permit 23 196397 BLD (revision 01)

    Revision issued
  • Alternative solution

    This application is for a revision to an official building Permit handed out on Feb, 15, 2024. Permit No.23 196397 BLD 00 NH. The changes relate to the removal of the firewall from the lower level garage,the addition of a fire alarm system, and an adjustment to the driveway access from the street. Severalstructural related changes have also been made to beams and trusses that are now being supported bythe internal concrete wall (previously designed firewall). Classification has changed to OBC 3.2.2.46.

    Applied Jul 2, 2024 · completed Sep 18, 2024 · Permit 24 173402 ALT

    Approved
  • New house · New building

    Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 242805 ZAP, 23 128448 MV and Final and Binding A0177/23NY.

    Applied Aug 31, 2023 · issued Feb 15, 2024 · 1 home added · Permit 23 196397 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 242805 ZAP, 23 128448 MV and Final and Binding A0177/23NY.

    Applied Aug 31, 2023 · issued Feb 15, 2024 · Permit 23 196397 PLB

    Inspections under way
  • Demolition

    Proposal to demolish the existing 2 storey SFD-detached dwelling.

    Applied Aug 31, 2023 · issued Feb 15, 2024 · completed Apr 19, 2024 · 1 home removed · Permit 23 196363 DEM

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 242805 ZAP, 23 128448 MV and Final and Binding A0177/23NY.

    Applied Aug 31, 2023 · issued Mar 19, 2024 · Permit 23 196397 HVA

    Permit issued
  • Drains and site services

    Drain - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 242805 ZAP, 23 128448 MV and Final and Binding A0177/23NY.

    Applied Aug 31, 2023 · issued Feb 15, 2024 · Permit 23 196397 DRN

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement.

    Decision: Approved on condition (hearing Jun 22, 2023)

    Filed Mar 29, 2023 · File A0177/23NY

    Closed
  • Minor variance · New R building

    To construct a new three-storey detached dwelling with an integral garage. The existing dwelling would be demolished. This application was deferred from the Committee of Adjustment hearing of November 10, 2016.

    Decision: Approved (hearing Jan 26, 2017)

    Filed Sep 28, 2016 · File A0847/16NY

    OMB appeal

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 14 Park Lane Crcl · Minor variance

    Proposal to construct a new detached dwelling and ancillary structure

    190 m away · filed Feb 22, 2024 · Approved

  • 14 Park Lane Crcl · Consent

    Proposal to obtain consent to sever part 3 from 14 Park Lane Circle and transfer them to 12A Park Lane Circle.

    190 m away · filed Dec 9, 2022 · Approved

  • 14 Park Lane Crcl · Minor variance

    Proposal to construct a new single family dwelling. File numbers B0052/22NY and A0723/22NY, A0023/23NY will be jointly considered.

    190 m away · filed Oct 26, 2022 · Approved

  • 1 Hyde Park Crcl · Minor variance

    To construct a new two-storey dwelling. Please note that more than 50% of the exterior walls of the existing dwelling are to be removed. As such, this proposal is deemed to be a new dwelling.

    160 m away · filed Mar 29, 2018 · Approved

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.