Toronto address · Ward 9, Davenport
60 Armstrong Ave
The City of Toronto has 12 building permits since 2017 (11 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposal to demolish laneway garage and shed and construct by a two-storey laneway suite at rear. See Folder 22 171557 ZAP 00 ZR
Applied May 26, 2026 · issued Jun 9, 2026 · Permit 23 200595 HVA
- Revision issued
Small residential project · New laneway / rear yard suite
REVISION 02: add a window, a skylight, and to reduce the size of the second floor to follow the contour of the the existing walls on the South East corner of the first floor. Area of work 1.0m² REVISION 01: Proposed revision to interior alteration at first floorProposal to demolish laneway garage and shed and construct by a two-storey laneway suite at rear. See Folder 22 171557 ZAP 00 ZR
Applied Mar 17, 2026 · issued Apr 8, 2026 · 1 home added · Permit 23 200595 BLD (revision 02)
- Revision issued
Small residential project · New laneway / rear yard suite
REVISION 01: Proposed revision to interior alteration at first floorProposal to demolish laneway garage and shed and construct by a two-storey laneway suite at rear. See Folder 22 171557 ZAP 00 ZR
Applied Nov 28, 2025 · issued Dec 15, 2025 · 1 home added · Permit 23 200595 BLD (revision 01)
- Revision issued
Plumbing
REV Plumbing - Proposed revision to interior alteration at first floorProposal to demolish laneway garage and shed and construct by a two-storey laneway suite at rear. See Folder 22 171557 ZAP 00 ZR
Applied Nov 28, 2025 · issued Dec 2, 2025 · Permit 23 200595 PLB (revision 01)
- Permit issued
Plumbing
Plumbing - Proposal to demolish laneway garage and shed and construct by a two-storey laneway suite at rear. See Folder 22 171557 ZAP 00 ZR
Applied Sep 24, 2025 · issued Sep 24, 2025 · Permit 23 200595 PLB
- Inspections under way
Drains and site services
Drain - Proposal to demolish laneway garage and shed and construct by a two-storey laneway suite at rear. See Folder 22 171557 ZAP 00 ZR
Applied Sep 11, 2023 · issued Sep 15, 2025 · Permit 23 200595 DRN
- Permit issued
Small residential project · New laneway / rear yard suite
Proposal to demolish laneway garage and shed and construct by a two-storey laneway suite at rear. See Folder 22 171557 ZAP 00 ZR
Applied Sep 11, 2023 · issued Sep 15, 2025 · 1 home added · Permit 23 200595 BLD
- Work not started
Small residential project · Addition(s)
Proposed construction of a new third storey addition (54.12m2) with interior alterations to second floor (79.24m2) of existing two storey single family detached dwelling.
Applied Dec 10, 2014 · issued Jan 14, 2015 · Permit 14 262739 BLD
- Work not started
Plumbing
Plumbing - Proposed construction of a new third storey addition (54.12m2) with interior alterations to second floor (79.24m2) of existing two storey single family detached dwelling.
Applied Dec 10, 2014 · issued Jan 14, 2015 · Permit 14 262739 PLB
- Closed
Plumbing
Plumbing - Proposal to underpin existing basement wall and add a basement walkout in existing single family dwelling.
Applied Feb 27, 2014 · issued Mar 7, 2014 · completed Jan 23, 2026 · Permit 14 122764 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to underpin existing basement wall and add a basement walkout in existing single family dwelling.
Applied Feb 27, 2014 · issued Mar 7, 2014 · Permit 14 122764 BLD
- Inspections under way
Small residential project · Multiple projects
Permit to construct new ground floor addition with new balcony above. Existing single family dwelling. Refer to CofA and ZZC files.
Applied Nov 21, 2011 · issued Nov 25, 2011 · Permit 11 313048 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1260 Dufferin Street, 1245 Dupont Street and 213 Emerson Avenue
50 storeys · 588 homes · Residential
390 m away · Site plan · Under review · filed Mar 25, 2026
- Under appeal
1260 Dufferin Street, 1245 Dupont Street and 213 Emerson Avenue
37 storeys · 3,547 homes · Residential
390 m away · Rezoning · Under appeal · filed Apr 5, 2022
Neighbours’ Committee of Adjustment files within 250 m
45 Armstrong Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing extensions to the upper and lower ground floor decks, and a new rooftop access staircase (within the attic space). Also, to permit the existing rooftop deck which was constructed without an authorized building permit. The existing rear one-storey addition (vestibule leading to the basement level) and rooftop access stairs will be demolished.
30 m away · filed May 15, 2026 · Approved
80 Armstrong Ave · Minor variance
To alter the existing rear one-storey detached ancillary building (two-car garage, abutting the laneway) by constructing a complete second storey addition (cantilevered at the south side of the building), to contain one laneway suite. There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).
60 m away · filed Mar 3, 2026 · Approved
10 Millicent St · Minor variance
To alter the existing rear one-storey detached ancillary building (one-car garage), by constructing a one-storey addition along a portion of the south side wall, to contain a lounge area and bathroom.
160 m away · filed Dec 4, 2025 · Approved
750 Brock Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition.
200 m away · filed Sep 12, 2025 · Approved
27 Millicent St · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck (green rooftop on second level) and stairs, a complete third storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (containing a garage on the ground level and one laneway suite on the second level), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
70 m away · filed Apr 2, 2025 · Approved
98 Millicent St · Minor variance
To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was converted into an additional residential dwelling unit. There will be a total of four residential dwelling units on this lot (two units within the main dwelling and two units within the ancillary building).
160 m away · filed Jan 27, 2025 · Postponed
136 Millicent St · Minor variance
To construct a new three-storey semi-detached apartment building (multiplex containing six residential dwelling units) with front and rear balconies on the second and third storeys, two rooftop terraces (above the third storey), front and rear entrances on the ground floor, and front and rear basement walkouts.
250 m away · filed Oct 2, 2024 · Approved
83 Millicent St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with basement extension below, and a rear ground floor deck. The existing ancillary building (detached garage) in the rear yard, abutting the laneway, will be maintained and unaltered.
120 m away · filed Jun 22, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.